Laserfiche WebLink
FROM FAX NO, :2099315186 �g. 09 2003 04:08PM P17 <br /> 8. Allowing for two feet of freeboard,what is the approximate storage capacity of the <br /> wastewater pond(s)? Provide a water balance that evaluates the containment structures <br /> ability to provide sufficient capacity on a month-by-month basis. Include monthly <br /> evaporation,precipitation,and irrigation rates as well as monthly discharge volumes. <br /> Rainfall shall be based on the 100-year return period total annual precipitation. <br /> Not applicable. See answer to Number 7 above. <br /> 9. Describe management provisions that will be implemented to prevent the occurrence of <br /> fie,mosquitoes, odor nuisances,and problems such as pond overflows(maintenance <br /> plans, standby pumps or generators,and contingency plans etc.). <br /> Not applicable. See answer to Number 7 above, <br /> 10. Describe any water or product treatment that is planned(water softeners,reverse osmosis, <br /> etc.). Describe the source of hot water at the site. Will water chillers be used at the site? <br /> There is no water treatment planned other than preheating for process use. Hot water ' <br /> will be supplied by a 300,000 BIVIHr domestic hot water heater for process and cleanup <br /> and by two (2) 40,000 BTUIHr domestic hot water heaters for domestic use. Water <br /> chillers will not be used. <br /> 11. Describe how solid waste and septage will be disposed, including; <br /> a. Method of disposal; <br /> b. Frequency of disposal; <br /> c. Disposal site/area name(s)and location(s). <br /> Solid waste will be disposed of as previously described in Nitrate Loading& d <br /> Suitability Study Septic System Design.Dated December 31,_2002,and pWared� <br /> Chesney Consulting on page 8 as well as the Chesney.Co_nsu_lting,_ In ormation <br /> Requested b_the he Rggoonal Water Control B�yard on page. Off-specification, spoiled, or <br /> contaminated materials will be disposed of as solid waste and disposed of in the waste <br /> system. We will have regular garbage pickup. Ido not know the disposal site name. <br /> Sewage will be pumped as needed and disposed of at the White Slough Site in-Lodi, The <br /> frequency will depend on the efficiency of our system but is estimated to be once every <br /> twenty(20)years based on our current operating history of eight years into a septic <br /> system that is substantially less efficient than the new one we are proposing, Our <br /> operating permit from San Joaquin County has quarterly monitoring and our system U <br /> equipped with level monitoring and alarming. <br /> 12.Do active or abandoned industrial, agricultural,domestic, or groundwater wells exist at <br /> the site? If yes,provide a map showing their location(s). Include available data on the <br /> rte., <br /> V <br />