Laserfiche WebLink
FROM FAX NO. :2099315186 �an. 11 2003 07:18PM Pb <br /> R <br /> ilk ' <br /> 8. Allowing for two feet of freeboard,what is the approximate storage capacity ofthe <br /> wastewater pond(s)2 Provide a water balance that evaluates the containment structures <br /> E ability to provide sufficient capacity on a month-by-month basis. Include monthly <br /> evaporation,precipitation,and irrigation rates as well as monthly discharge volumes. <br /> Rainfall shall be based on the 100-yeah return period total annual precipitation. <br /> Not applicable. See answer to Number 7 above. <br /> 9. Describe management provisions that will be implemented to prevent the occurrence of <br /> fie,mosquitoes, odor nuisances,and problems such as pond overflows (maintenance <br /> plans,standby pumps or generators, and contingency plans etc.). <br /> Not applicable. See answer to Number 7 above. <br /> 10.Describe any water or product treatme it that is planned(water softeners,reverse osmosis, <br /> etc.). Describe the source of hot water at the site. Will water chiller be used at the site? <br /> There is no water treatment planned other than preheatingfor process use. Hot water <br /> will be supplied by a.300,000 BTU/Hr domestic hot water heater for process and cleanup <br /> and by two(2)40,000 BTU/Hr domestic hot water heaters for domestic use. Water <br /> chillers will not be used. <br /> 11.Describe how solid waste and septage will be disposed, including: <br /> a. Method of disposal; <br /> b. Frequency of disposal; <br /> c. Disposal site/area name(s)and location(s). <br /> Solid waste will be disposed of av previously described in Nitrate Loading Stu& Soil <br /> Suitability Stud Se tic S <br /> ystem Design, Dated December 31.-2002 d re red b <br /> Chesney Consulting on page S as well as the Chesney Consultin& l'n ormation_ <br /> Re nested b the Re 'onal Water Control Board on page, Off-specification, spoiled, or <br /> contaminated materials will be disposed of as solid waste and disposed of in the waste <br /> system. We will have regular garbage pickup. I do not know the disposal site name. <br /> Sewage will be pumped as needed and disposed of at the White Slough Site in Lodi. The <br /> frequency will depend on the efficiency of our system but is estimated to be once eve)y <br /> twenty(20)years based on our current operating history of eight years into a septic <br /> system that is substantially less eJflcient than the new one we arepropwing. our <br /> operating permit from San Joaquin County has quarterly monitr ring and our system is <br /> equipped with level monitoring and alarming. <br /> 12.Ito active or abandoned industrial,agricultural,domestic,of groundwater wells exist at <br /> the site? 1f yes,provide a map showing their location(s). Include available data on the <br />