My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004324
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18819
>
2600 - Land Use Program
>
PA-0200428
>
SU0004324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:09 AM
Creation date
9/4/2019 6:21:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004324
PE
2632
FACILITY_NAME
PA-0200428
STREET_NUMBER
18819
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
APN
01924018
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
18819 E HWY 88
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\18819\PA-0200428\SU0004324\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> SCHENONEICHOCOROLICS PRELIMINARY SEPTIC SYSTEM SPECIFICATIONS <br /> Orenco(k) Septic Tank Effluent Pumping(STEP)for Duplex Commercial-On Demand Pumping <br /> I. RISERS AND LIDS: All tanks to be manholed per EHD requirements for access to internal <br /> al be watertight with a watertight seal and correlated <br /> vaults and for septage pumping. All risers shall gh <br /> with septic tank manufacturer(e.g. P&L Concrete). Risers are to be 24 inches in diameter and <br /> may extend 3 inches above original grade to allow for settlement and to assure drainage away from <br /> access. If bury depth is greater than 36 inches,riser diameter must be 30 inches. Lids must be <br /> bolted onto each riser and must support 2500 lb wheel loads. If lids are to be traffic bearing, cast <br /> iron must be used. <br /> I 2. PUMP VAULT: A 24 inch,Orenco®BioTube Pump Vault®is specified in the last <br /> compartment of the secondary septic tank, Model PVU57 2419 for effluent pumping. Housed <br /> inside the vault is the BioTube assembly consisting of 118 inch mesh polypropylene tubes. <br /> f 3. FLOATS AND SWITCH ASSEMBLY: Model MF3A-YP,G,W. Yellow/purple wires <br /> correspond with the high water alarm and lag pump on, green wire corresponds with pump on/off <br /> and white wire correspond with low water alarm. <br /> 4. EFFLUENT PUMPS:Two pumps required in Pump Vault(duplex system),Model P50-0712. <br /> Pumps 50 gpm,at 314 horsepower and 230 volts. <br /> 5. ELECTRICAL SPLICE BOX:Model SB5 <br /> I4 6. CONTROLS AND ALARMS:Panel with high and low water alarm,with lag pump on. <br /> Model MVP-DAX-2RO. Pump control panel mounted on exterior wall within 50 feet of the tanks <br /> and pumps. Control panel must have a lockable disconnect switch. <br /> MAN uA � <br /> 7, ISTRIBUTION VALVE: <br /> keehfinesleeepage pits. 1 <br /> Must be protected against freezing. Model V4402A. <br /> 8. ADDITIONAL APPURTENANCES: Carbon Filters for i0of vents and disposal field vents. <br /> Model will depend on pipe size:Model CF4 or CF6 <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.