Laserfiche WebLink
California Regional Water Quality Control oI Board <br /> Central Valley Region ' <br /> �# <br /> Winston H.Hickox Robert Schneider,Chair <br /> Secretary for Gray Davis <br /> Environmental Sacramento Main Office <br /> Protection Internet Address: bttp://—,,Swrcb.ca.gov/–Twqcb5 Governor <br /> 3443 Aoutier]load,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000-FAX(916)255-3015 <br /> 21 October 2002 <br /> Jose Rubianes Frank Giannecchini <br /> San Joaquin County Comm. Develop. Dept. P.O. Box 10 <br /> 1810 E. Hazelton Ave. Linden, CA 95236 <br /> Stockton, CA 95205 <br /> Ernie Schenone Jr. <br /> 3765 N. Wilcox #H <br /> Stockton, CA 95215 <br /> C -02110428 SA `.SITE APPROVAL FOR CH_OC TE MANUFACTURING AND <br /> PA _(_ )� <br /> DISTRIB&T1 0-N FA CIL , CLEMENTS, SAN JOAQUIN COUNTY <br /> I have reviewed the Application Referral for the chocolate manufacturing and distribution facility in <br /> Clements, San Joaquin County distributed by the San Joaquin County Community Development <br /> Department. The Application Number is PA-0200428 (SA). The document briefly describes plans to <br /> remodel an existing 3,600 square foot building and add 12,600 square feet of manufacturing and <br /> warehouse building space. The Application Referral doesn't describe any wastewater generation or <br /> disposal plans with the exception of a septic tank and leach field areas. <br /> Food manufacturing generates high strength wastewater that is not suitable for discharge to a septic tank <br /> system. Because wastewater will be generated from an industrial process, Waste Discharge <br /> ;Requirements (WDRs) will be required for the discharge of wastewater at the site: The property owner <br /> .and/or facility operator shall submit a Report of Waste Discharge (RWD) at leas—t "120 days prior to <br /> discharging wastewater..at the site. California Water Code Section 13260 requires submittal of the RWD. <br /> Construction Stormwater Permit <br /> A NPDES General Permit for Storm Water Discharges Associated with Construction Activities, Order <br /> No. 99-28-DWQ is required when a project involves clearing, grading, disturbances to the ground, such <br /> as stockpiling, or excavation. Currently, construction activity that involves soil disturbances on <br /> construction sites five acres or greater or which are part of a larger common plan of development or sale <br /> require a construction storm water permit. <br /> Dewatering Permit <br /> The proponent may be required to file a Dewatering Permit covered under Waste Discharge <br /> Requirements General Order for Dewatering and Other Low Threat Discharges to Surface Waters <br /> Permit, Order No. 5-00-175 (NPDES CAG995001). The following discharges maybe covered by this <br /> California Environmental Protection Agency <br /> �a Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our Web-site at http://wutiv.swreb.ca.gov/rwgcb5 �' <br />