Laserfiche WebLink
Soil Suitability and Nitrate Loading Study <br /> SORELLE WINERY <br /> 9593 North State Route 88, Stockton, California <br /> TABLE OF CONTENTS <br /> I <br /> SECTION PAGE <br /> 6.0. PERCOLATION TESTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 6.1. SITE MAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 6.2. NUMBER OF PERCOLATION TESTS PERFORMED . . . . . . . . . . . . . . . . . . . 9 <br /> 6.3. DESCRIPTION OF PERCOLATION TEST HOLE . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 6.4. DESCRIPTION OF THE PERCOLATION TEST HOLE - POST SOAK . . . . . . 9 <br /> 6.5. PERCOLATION TEST CONFORMED TO SJC POLICY EHD 02-02 . . . . . . . . 9 <br /> 6.6. COMPLETED PERCOLATION TEST FORM . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> 6.7. POTENTIAL PROBLEMS PREDICTED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> 6.8. PERCOLATION TEST FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> 7.0. CHEMICAL AND PHYSICAL PROPERTIES OF SOIL . . . . . . . . . . . . . . . . . . . . 10 <br /> 7.1. CHEMICAL AND PHYSICAL PROPERTIES OF SITE SOILS . . . . . . . . . . . . 10 <br /> 7.2. MASS TRANSPORT PROPERTIES OF UNDERLYING SITE SOILS . . . . . . 11 <br /> 8.0. GROUND WATER ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 <br /> 8.1. DESCRIPTION OF LOCAL GROUND WATER . . . . . . . . . . . . . . . . . . . . . . . 11 <br /> 8.2. EXISTING OR POTENTIAL GROUND WATER CONTAMINATION . . . . . 12 <br /> 8.3. CURRENT AND FUTURE USE OF GROUND WATER AT THE SITE . . . . 12 <br /> 9.0. IMPACT OF NITRATE TO GROUNDWATER . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 <br /> 9.1. CURRENT OFF-SITE SOURCES OF NITRATE . . . . . . . . . . . . . . . . . . . . . . . 12 <br /> 9.2. IMPACT OF RAINFALL CONTRIBUTION TO NITRATE LOAD . . . . . . . . . 12 <br /> 9.3. CURRENT ON-SITE SOURCES OF NITRATE . . . . . . . . . . . . . . . . . . . . . . . . 13 <br /> 9.4. FUTURE ON-SITE SOURCES OF NITRATE . . . . . . . . . . . . . . . . . . . . . . . . . 13 <br /> 9.5. MASS BALANCE OF NITROGEN LOADING . . . . . . . . . . . . . . . . . . . . . . . . 14 <br /> 9.6. IMPACT OF NITROGEN LOADING FROM SITE PROJECT . . . . . . . . . . . . 15 <br /> 10.0. TOTAL NITRATE IMPACT FROM PROPOSED PROJECT . . . . . . . . . . . . . . . . 16 <br /> 11.0. MITIGATION METHODS PROPOSED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 <br /> 12.0. CONCLUSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 <br /> 13.0. LIMITATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 <br /> Advanced GeoEnvironmental,Inc. <br />