Laserfiche WebLink
PC: 4-15-93 <br /> SA-93-3 <br /> e. A left-tum lane snail be provided from 350 feet north of Fairchild Lane to 400 feet north <br /> of the main entrance. (Development Title Section 9-1150.2) <br /> t Acceleration and 'deceleration lanes shall be provided for the main driveway. All <br /> improvements shall be In conformance with the Improvement Standards and <br /> Specifications of the County of San Joaquin. All improvement plans and specifications <br /> must approved by the County of San Joaquin Department of Public Works prior to <br /> approval of the Improvement Plan. (Development Title Sections 9-1100.3 and 9-1150.2) <br /> g. The frontage irripivverrierits for Jack Tone Road shall be constructed in conformance with <br /> the standards for one-haftof a 84-foot wide right-of-way rural arterial road. The <br /> construction of the frontage improvements (the portion that is not required by the traffic <br /> study)will be rred upon execution by the owner of a Deferred Frontage and Roadway <br /> Improvement Agreement or a Secured Deferred Frontage and Roadway Improvement <br /> Agreet` M with a deposit equlvalent.to the estimated construction costs prior to approval <br /> of the Improvement Plan. A $250:170 fee currently is required,for processing, per <br /> Development Tile Table 9-240.2, in addition to a copy of the Grant Deed and an estimate <br /> for the required frontage Improvements. The estimate and legal description shall be <br /> prepared by a Registered CNN Engineer with a typical section.drawing on a form to be <br /> supplied by the Department of Public works and submitted to Public works for approval. <br /> As an option. Public Works will prepare the drawing and estimate for an additional fee of <br /> $115.00. (Development Title Section 9-4150.2) <br /> h. Driveway approaches shah be hpvved in accordance with the requirements of San <br /> Joaquin County Standard R-17 prior to issuance of the building permit. Radrand width <br /> of the driveway approaches shall be improved to allow trucks to make legal turning <br /> movements to and from Fairchild Lane. (Development Title Section 9-1145.4) <br /> L An eIt permit shams be required for work within the road right-of-way. <br /> (Development Title Section 9.1145.2) <br /> 3. PU81JC HEALTH SgRMEs.rnerxnisraal.Heaith DMWQVJ: <br /> a. C nstruct an individual sewage disposal system for the shed and any proposed offices <br /> under a•pern ikand h"p9cWn by the Enftnmental Health Division at the time of <br /> dk�ment (Ordinance Code Section 5.3003). <br /> b. Submit a report of waste discharge to the California Regional Water Duality Control <br /> Board,Central Valley Region,prior to development{Porter-Cologne Water Quality Control <br /> Act,Article 5, Sections 13280). <br /> C. OpeM pump, and backfM the septi:tank, seepage pti, or excavation of the house to be <br /> dMr led undwpgrmit grid bWectlon by the ErivImmyiental Health Division(Ordnance <br /> Code Section sem. <br /> R-93-365 -4- . SA--93-3 <br />