Laserfiche WebLink
Item No. <br /> PC: 4-15-93 <br /> SA-93.3 <br /> Page 10 <br /> e. A traffic study shah be conducted to determine the impacts and mitigation measures. <br /> CunvAative traffic with the project to the south, SA-93-4, shall be included in the study. <br /> The developer shall deposit with the County funds for all costs,as estimated by the Public <br /> F&Mies Division of the Department of Public Works, prior to Public Works preparing or <br /> c ng for the required,study. (Deva opment Title Section 9-1150.4) <br /> f. The frorsatge improvemens for Jack Tone Road shad be constructed in conformance with <br /> the standard for one-half of a Woot-wide.. rigid-ot-way n.iral_ arterial road. The <br /> oortstrucxlon of the frontage improvements (the portion that is riot required by the traffic <br /> study)will be deferred upon execution by the owner of a Deferred Frontage and Roadway f <br /> improvement Agreement or a Secured Deferred Frontage and Roadway Improvement. <br /> Agreement with a deposit equivalent to the estimated construction costs prior to approval <br /> of the Improvement Plan. A $280.00 fee currently is required for processing, per- <br /> Deve"Xnent Title Table 9-240.2;.in addition to a copy of the.Grant Deed and an estimate <br /> for the required frontage improvements. The estimate and.legal.description shah be <br /> prepared by a Registered Civil Engineer with atypical section drawing on a form to be <br /> supplied by the Department of Public Works and submitted to Public Works for approval. <br /> As an option,.Public Works wig prepare the drawing.and estimate for an additional fee of. <br /> $115:40. (Development-Title:Section 9-1150.2): w <br /> g: Driveway approaches stall=be improved in accordance-witty the"requirements of San <br /> Joaquin County Standard.RA 7prior to issuance of-the building permit. Radii and width f <br /> of.the drhreway approaches,shalt--be-Improved-to-allow, trucks to make-legal turning <br /> movements to and from Fairchild!_ane. (Development Title Section 9-1145.4)" <br /> h. An encroachment permit shag be required for" work within the road right-of-way. <br /> (Development Title Section 9-11452) <br /> 3. PUBIJC HEALTH SERVICES (Ernvironmental Healon Dhftoft <br /> Finish the septic system that is being installed by:Richard Pumping under Sanitation <br /> Permit No.92-3589 and inspected by the Environmental Health Division(Ordinance Code <br /> Section 5-3003). €' <br /> b. Construct an Individual sewage disposal system for the shed and arty proposed offices. <br /> under a permit and inspection by the Environmental Health Division at the time of <br /> development(Ordinance Code Section 5-3003). <br /> C. Submit a report of waste discharge to the California Regional Water Quality Control <br /> .Board,Central Valley Region,prior to development(Porter-Cologne Water Quality Control <br /> Act*Arode 5, Section 1328x). <br /> d. Open, pump, and baddig the septic tank, seepage pit;or wmvation of the house to be <br /> dernossW under permit and inspection by the Environmental Health Division(Ordinance., . <br />.. Code Section 5.MM)• <br />