Laserfiche WebLink
PC: 4-15-93 <br /> SA-93-3 <br /> b. A grading.plan s`hal.be submitted. by the applicant, and it shall be approved and a <br /> grading permit issued by the.Buikfing Inspection Division prior to any excavation or filling <br /> of earth material: <br /> (1) The grading.pian shall contain too information listed In the UBC, Appendix, <br /> Chapter 70, Section 7006(1). <br /> (2) The grading plan shall Include complete drainage details and elevations of the <br /> adjacent parcels. Retaining wall details shah be submitted where applicable. <br /> (3) Grading In excess of 5,000 cubic yards shall comply with Section 7014 of <br /> "Engfrieered Grading Requirements." <br /> (4) AN of the soils engineer shall be incorporated in the grading <br /> Ili <br /> (5) All compaction reports must be submitted to a foundation inspection. <br /> (6) AN grading permits are subject to approval by the other departments. <br /> (7) All grading authorized by the permit shall be approved prior to issuance of any <br /> boding permits or the beginning of any construction. <br /> C. The Construction Ske Pian $hall indicate Me following: <br /> (1) Provide parking for the physically handicapped. The spaces shall be located as <br /> close as possible to the primary entrance (CCR,T>ue 24). <br /> (2) Provide identiftcatl m signs for the parking,spaces,including the"tow away"sign, <br /> at each entrance.or visible from each space (CCR, 1`itie 24). <br /> (3) The slope of a parking space shall not exceed 1//s inch per foot (CCR, Title 24). <br /> CL Fire apparatus access roads shall be required for new development constructed when <br /> any portion of an exterior wall of the fast story i§ located more than 150 feet from the <br /> public atx.ess road. This road shop be constructed to meet or exceed standards <br /> published In Public W.grW—,.design standards (Section 10.203, UFC). The access road <br /> must be fully improved to these standards prior to any final Inspections. <br /> 5. AIR POLLUTION CONTROL ICT: <br /> a. The applicant shall comply wkh.the rules and regulations of the New Source Review Rule <br /> and will need to apply for an.A,uthorlty to Construct and Permit to Operate according to <br /> the rules and regulations of the District prior to operation. <br /> b. Fumigation chambers utilizing methyl bromide Shap' require a permit by the District <br /> pursuant to the rules and regulations. <br /> -22- <br />