Laserfiche WebLink
i <br /> f •1 s <br /> PC: 4-15-93 <br /> SA-93-4 <br /> 2 P C <br /> a. The Traffic impact M"Ion Fee WIN be required for this development. The fee Is due <br /> and payable at the time of bugding permit application. The fee currently Is$1,10200 per <br /> 1,000 gross square feet of building designated as"Manufacturing•in the Stockton area. <br /> The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolutions R- <br /> W-304 & R-91-1025) <br /> b. DrN*ways or access roads that exceed 150 feet in length from any public roadway shall <br /> be Improved In accordance with the requirements of Uniform Fire Code Section 10.207, <br /> San Joaquin County Standards F-1 a, F-1 b, and F-1 c, and the Linden-Peters Fire District <br /> prior to Issuance of the building permit. (Development Title Section 9-1145.5) <br /> C. The Water Supply Facilities Impact Mftatlon Fee will be required for this development. <br /> The fee is due and payable at the time of building permit application. The fee currently <br /> Is $95.00 per 1,000 gross square feet of building designated as 'Manufacturing' or <br /> 'Warehouse.' The fee shah be autom-1-aay Increased on January i of each year at the <br /> rate of 6.9 percent. An additional 3.5 percent shall be added to the fee upon payment <br /> for processing and administering the program. (Resolution R-91-327) <br /> d. A feft4um lane shag be provided from 350 feet north of Fairchild Lane to 400 feet north <br /> of the main entrance. (Development Title Section 9.11 S0.2) <br /> e. Acceleration and deceleration lanes shall be provided for the main driveway, and an <br /> acceleratton lanae shall be provided for the exit driveway. All improvements shall be in <br /> coroonnance with the Improvement Standards and Specifications of the County of San <br /> Joaquin. 'AN Improvement plans and specillcations must be approved by the County of <br /> San Joaquin Department of Pular Works prior to approval:of the Improvement Plan. <br /> (Development Title Sections 9-1100.3 and 9-1150.2) <br /> L The frontage Improvements for Fairchild Lane shall be constructed In conformance with <br /> the standards for one-half of a 60-foot-wide right-of-way rural°collector road. The frontage <br /> Improvements for Jack Tone Road shall be constructed In conformance with the <br /> standards for one4mllat an 844oat-wide right-of-way rural arterial road. The construction <br /> of the hw9age improvements (the portion that Is not required by the traffic study)Will be <br /> deferred upon execution by the owner of a Deferred Frontage and Roadway Improvement <br /> A'reerrtertt or a Secured Deferred Frontage and Roadway Improvement Agreement with <br /> a deposit equivalent to the estimated construction costs prior to approval of the <br /> Improvement Pian. A$280.00 fee currently Is required for processing, per Development <br /> Title Table 9-240.2. In addition to a copy of the Grans Deed and an estimate for the <br /> mqulred frontage improvements. The estimate and legal description shall be prepared <br /> by a Registered Civil EnInear with a typical section drawing on a form to be supplied by <br /> the Department of Public Works and'-submittedto Public Works for approval. As an <br /> option, Public Works WIN prepare the drawing and estimate for an additional fee of <br /> $115.00. (Development Tale Sec Oon 9-1150.2) <br /> -19- <br />