Laserfiche WebLink
Item No. 2 <br /> PC: 4-15-93 <br /> SA-93-3 <br /> Page 12 <br /> b. A grading plan snail be submitted by the applicant, and it shall be approved and a <br /> grading permit issued by the Building Inspection Division prior to any excavation or filling <br /> of earth material: <br /> (1) The grading plan shall contain the information listed in the UBC, Appendix, <br /> Chapter 70, Section 7006(1). <br /> (2) The grading plan shall include complete drainage details and elevations of the <br /> adocent parcels. Retaining wall details shall be submitted where applicable. <br /> (3) Grading in excess of-5,000 cubic yards shall comply with Section 7014 of <br /> 'Engineered Grading Requirements.• <br /> (4) AN of the soils engineer shall be incorporated in the grading <br /> plate <br /> (5) AN compaction reports must be submitted to a foundation inspection. <br /> (0) AN grading Rsrmks are subject to approval by the other departments. <br /> (7) AN grading authorized by the permit shall be approved prior to issuance of any . <br /> building permits or the beginning of any construction. <br /> r~ The Construction Site.Plan shall Indicate the following: <br /> (1) Provide parking for the physically handicapped. The spaces shall be located as <br /> close as possible to the primary entrance (CCR,Title 24). <br /> (2) Probion ion sign for the parking spaces,including the'tow away'sign, <br /> at each entrance or visible from each space (CCR, Title 24). <br /> (3) The slope of a parking space shall not exceed 1/. inch per foot (CCR, Title 24). <br /> d. Fire apparatus access roads shah be required for new development constructed when <br /> any portion of an exterior wall of the first story is located more than 15o feet from the <br /> public access read. This road shah be constructed to meet or exceed standards <br /> publIM d in Public Works' design standards (Section 10.203, UFC). The access road <br /> must be fully improved to these standards prior to any final inspections. <br /> 5. AIR POLLUTION CONTROL DISTRICT: <br /> a The applicant shell comply with the rules and.regulations of the New Source Review Rule <br /> and will treed to apply for an Authority to.;Corwtruct and Permit to Operate according to <br /> the rales and regulations of the District prior to operation. <br /> b. Fumigation chambers utilizing methyl bromide shall require a permit by the District <br /> pursuant to the rales and regulations. <br />