Laserfiche WebLink
Item No. 1 <br /> PC: 4-15-93 <br /> SA-93-4 <br /> Page.2 <br /> PROJECT DESCRIPTION <br /> The applicant is proposing the addition of cold storage to the existing Sierra Hills packing shed on a 25- <br /> acre site. The project is to be completed in two phases over a period of fire years. Phase 1 consists of <br /> constructing a 23,975-square foot building for cold storage of packed fruit. Phase 2 consists of <br /> constructing a 39,360-square-foot building for a controlled atmosphere cold storage building. There are <br /> currently about So employees, and during the peak packing season in late October, the number of <br /> employees may increase to 110. The hours of operation are from 7:30 am. to 4:30 p.m., five days a <br /> week. Sewage disposal is provided by an existing septic system, and water is provided by a public well. <br /> Storm drainage will be provided by an on-site drainage pond. <br /> The 12-M" parcel that is contiguous to the north is the proposed site for a pending Site Approval <br /> application for a cherry packing shed and controlled atmosphere cold storage. The applicant is proposing <br /> that the two projects share a common driveway and a common drainage pond. The perimeter of both <br /> sites will be enclosed by a fence for security purposes. <br />