Laserfiche WebLink
Rick Griffin 2 • <br /> Community Development Department <br /> PA-1000279 <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br /> RECOMMENDATIONS: , <br /> t <br /> 1 n n t Map ; e ,1 (Development Title Seetien 9 915.2) <br /> . <br /> 2. The Parcel Map requirement is waived A Certificate of Compliance is required. A fee based on the current <br /> fee schedule is required for the processing of the legal descriptions. (Development Title Section 9-890.4) <br /> 3. The designated remainder parcel shall be designated and labeled as "Designated Remainder" on the Par-eel <br /> Map Certificate of Compliance. (Subdivision Map Act Section 66445) <br /> 4. All easements of record shall be sly noted on the PaFeel Rap Certificate of Compliance. (Development <br /> Title Section 9-910.20) <br /> f <br /> 5. The leeation „Ftp T,.,.he f Gfeek shall be_del;..,,., ed en the Par-eel Map <br /> UV.i1111VU4VU Vll SUV 1 u�vv i.aul+ <br /> 6. An Irrevocable Offer and Agreement to Dedicate Right-Of Way in fee for future maintenance and <br /> construction along Mosher Creek shall be recorded prior to approval of the parcel map Certificate of <br /> Compliance. Said right-of-way shall be no less than fifty feet(50')measured perpendicularly from the <br /> t Mosher Creek bank hinge outward(landside)towards the subject property and between the east line of <br /> Parcel 2(APN 065-150-04)and the west line of the "Designated Remainder"(APN 065-150-04). Contact <br /> the Flood Management Division of the Department of Public Works(209-468-7612)for processing said <br /> agreement. (California Water Code—Appendix § 79-5). <br /> Informational Notes: <br /> (i.) Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a State <br /> E NPDES construction permit. Dischargers whose projects disturb 1 or more acres of soil or whose projects <br /> disturb less than 1 acre of soil and is not part of a larger common plan of development, are required to <br /> obtain coverage under the current General Permit for Discharges of Storm Water Associated with <br /> Construction Activity(www.swreb.ca.gov/stormwtr/gen_const.htmt#const_permit). <br /> (ii.) All future building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9,Chapter 9-1605) <br /> and all requirements of the State of California(CCR Title 23)that are in force at the time of permit <br /> issuance. As an example,these requirements may include raising the finish floor elevation one foot above <br /> the expected flood level and/or using flood resistant materials. <br /> AC:DS <br /> ILSjpwgov.orgLshareslDevServrcesOPubServICOMMENTSIM,SIYR 20101P,4-10002791P,4-1000279 REY.doc <br /> k <br />