Laserfiche WebLink
May 10 05 01 : 11p p. 2 <br /> 1 .y.. <br /> May 10, 2005 <br /> ATT: Robert McC]cllon, Supervising REHA <br /> Addendum: to Manure Management Plan(PA 03-565) <br /> 1. The Manure will be stack no more then seven days. <br /> Manure will be spread and disk the same day within 24 hours. <br /> 2. The Home has it own contract for removal of trash. <br /> 3. Well is location is east of Mobil home. See plan <br /> 4. Sept tank is on the west side of Mobil home. See plan <br /> 5_ Weather(most wind come from the South along with the rain- Container <br /> will be placed on ground and all manure will be remove and taken to <br /> landfill facility if needed_ <br /> 6. There is 2.1 yard each week <br /> 7. 2.1 yard manure per week will be spread and dist with 10' path over 70+ <br /> ac. <br /> 8. All water tank and water will be checked on daily bases for leaks. Animals <br /> will be vacuum instead of washed. <br /> Della Gaar-Todeschini <br /> Owner <br /> 2 <br />