Laserfiche WebLink
USE PERMIT <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> "! 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> BUSINESS PHONE: (209) 468-3121 <br /> q'•.. ,j�P Business Hours: 8:00 a.m. to 5:00 p.m. (Monday through Friday) <br /> (/FOP <br /> APPLICATION PROCESSING STEPS <br /> STEP 1 CHECK WITH STAFF - Development Services Staff will explain the requirements and procedures to you. <br /> STEP`2 SUBMIT YOUR APPLICATION - When you apply,file all of the following: <br /> �- Fqc The staff will let you know the current cost of filing an application. Make checks payable to the San Joaquin <br /> L/ County Treasurer. ^� t <br /> M Seven (7)copies of the completed application information forms(attached)which all owners must sign. <br /> • SS�PLAN Seven (7)copies of a folded Site Plan (see attached)and two(2)copies of a legible 8-1/2"x 11"site plan. <br /> RDOUS One copy of a completed Hazardous Materials Disclosure Survey form (a copy of the form is attached). <br /> TERIALS <br /> -�A)fED One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a"will-serve"letter from the appropriate <br /> water,sewer and drainage entities at the time of filing. This letter must include a statement from the agency <br /> that they will serve the proposed development, and has, or will have, the capacity to provide such service. <br /> • APPLICATION Staff will check your application. If anything is missing, you will be notified in writing. The applicant will be <br /> COMPLETE sent a postcard once the application has been determined complete. (Your application cannot be processed <br /> until it is corn tete. <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will decide if the proposal will have an adverse effect on the environment. If there are no adverse <br /> effects, the application will be processed. If there are potential adverse effects,further environmental review <br /> will be required. Projects that have the potential to adversely affect the environment will require the <br /> preparation of an E.I.R. This may extend the processing time. _ <br /> • REFERRALS Staff will refer the application to any County departments,other agencies and surrounding property owners <br /> AND ACTION affected by your proposal. Al the end of a review and comment period a staff report will be prepared and the <br /> Planning Commission will hold a public hearing. If the Commission can make the required findings,the <br /> application will be approved. Typically action will be taken by the Commission within 8 weeks after <br /> application. <br /> • FINAL ACTION The action of the Commission can be appealed to the Board of Supervisors. The Commission's action is final <br /> unless appealed. For further information on the length of the appeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The staff will send you the final action and if it is approved, it will list conditions, by department,that must be <br /> met before you can start project. <br /> • IMPROVEMENT In addition to the Site Plan,an Improvement Plan is frequently required as a condition of approval. This is an <br /> PLANS engineered plan showing drainage,grading,frontage improvements, access,on-and off-site service and utility <br /> facilities, landscaping and circulation/parking details. <br /> • DRIVEWAY Driveway Permits must be acquired from the Public Works Department for any work performed within the <br /> PERMITS road right of way. If the project fronts on a state highway these permits are obtained from Caltrans. <br /> • SANITATION 8 Projects that will utilize new on-site sanitation disposal and/or on-site wells, must get permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUSINESS If the project involves a business, a Business License must be approved prior to starting operation. Business <br /> LICENSES License applications can be processed concurrently with the Use Permit application. <br /> • BUILDING If the project involves construction a building permit must be approved prior to commencement of work. <br /> PERMITS I I <br /> • OTHER Frequently other local, state and/or federal agencies will require permit§Prior tQ np,�v uses being established <br /> PERMITS (e.g. Air Pollution Control District, Regional Water Quality Control 86'rd or Attie Sh4fts Office). The <br /> Community Development Department will identify additional permits we are aware of that may be required for <br /> our project. <br /> F 0EVSVC\Planning Application Forms\Use Permit.(Revised 1-2-03) Page 1 of 9 <br />