Laserfiche WebLink
in a twenty-five(25) foot wide right-of-way from the centerline of Frewert Road to the <br /> Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-75 <br /> property line across the parcel's frontage. (A$280.00 fee currently is required for <br /> processing per Development Title Table 9-240.2. In addition to a copy of the Grant Deed <br /> and a legal description of the parcel to be offered for dedication.) (The fee due will be <br /> based on the current fee schedule.) <br /> (Development Title Section 9-1150.5) <br /> 4. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $613.00 per <br /> 1,000 gross square foot of building designated as Manufacturing. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. A credit may be allowed if it can be verified <br /> that the existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00-433) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066)that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> GK:sh <br />