Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. 8 <br /> RICHARD A. STAGNO <br /> STAGNO'S MEAT COMPANY <br /> SAN 7OAQUIN COUNTY <br /> 4. The Discharger shall comply with all conditions of this Order, including timely <br /> submittal of technical and monitoring reports as directed by the Executive Officer. <br /> Violations may result in enforcement action, including Regional Board or court orders <br /> requiring corrective action or imposing civil monetary liability, or in revision or <br /> rescission of this Order. <br /> 5. The Discharger shall comply with the following time schedule to assure compliance <br /> with Groundwater Limitations in Section E of this Order. <br /> Task Compliance Date <br /> Submit Groundwater Monitoring Workplan 60 days from Issuance of this Order <br /> Submit Well Installation Report 30 days Prior to Commencement of <br /> Slaughterhouse Operations <br /> Prior to construction,plans and specifications for groundwater monitoring wells shall be <br /> submitted as a workplan to Board staff for review and approval. This workplan shall <br /> include the following: <br /> • location of upgradient and downgradient wells on map of the site; <br /> • drilling and development methods; <br /> • well construction details as shown on a construction diagram; <br /> • sampling containers and analytical methods; and <br /> • schedule of field activities. <br /> Upon installation of the monitoring wells and completion of sampling and analysis of <br /> the baseline samples, a report of the field activities and analytical sample results shall be <br /> submitted. This report shall contain the chain-of-custody forms and laboratory <br /> analytical sheets. In addition, this report shall provide regional groundwater quality data <br /> from off-site supply wells of similar depth. A discussion of potential sources of <br /> degradation of the deeper water bearing zones, using both on- and off-site supply well <br /> data, shall be provided. <br /> 6. If the Regional Board staff notify the Discharger that review of monitoring data indicate <br /> evidence of a release that threatens or poses a potential threat to water quality, the <br /> Discharger will formulate a mitigation plan and submit it to the Regional Board within <br /> 90 days of notification. <br /> 7. A copy of this Order shall be kept at the discharge facility for reference by operating <br /> personnel. Key operating personnel shall be familiar with its contents. <br /> 8. The Board will review this Order periodically and will revise requirements when <br /> necessary. <br /> c Ackwfiles\agri cu I ture\agwdm\stagno\swgnowdm <br />