Laserfiche WebLink
i <br /> Fr <br /> Valley Organics, Inc. <br /> Application — Site Approval. Exhibit B <br /> Storm Drainage <br /> No additional storm drainage will be created by the proposed improvements. All <br /> water applied to the materials during processing will be absorbed or will <br /> evaporate. <br /> Lighting <br /> Operations will be during daylight hours only; no lighting will be required. <br /> Water Discharge Permit <br /> As noted under Storm Drainage, any water applied to the material during <br /> processing will be absorbed or evaporate. <br /> Traffic Impact Mitigation <br /> There should be no impact on area traffic. What few vehicle trips there will be <br /> will access the site from Interstate 5 along Frewert Road. <br /> Hazardous Material Manaciement Plan <br /> No hazardous materials will be stored on site. Fuel for the equipment will be <br /> transported to the site on a daily basis in the truck assigned to the project. <br /> Since all equipment is self-powered, only the well pump would be affected by a <br /> utility service interruption. If from time to time the electrical service to the <br /> property is interrupted, water can still be obtained by gravity feed from an 800 <br /> gallon water tank that will be installed on site. <br /> In rare cases of long term utility failure, a portable diesel generator will be <br /> moved to the site to provide power. <br /> Odor Management <br /> The site is located in an agricultural area. See also: "Odor Management Impact <br /> Plan" <br />