Laserfiche WebLink
.. ■Fad <br /> } <br /> Chandler Martin �/ -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-05-726 (SA) <br /> Construction Cost Index as published by the Engineering News Record.) (Resolutions 00-433) <br /> 4. The Regional Traffic Impact fee shall be required for this Development. The fee is due and payable at the <br /> time of Building Permit Application. The fee shall be on current schedule (R-06-38). <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> Note: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:SH:av <br /> PACONWFNTSISAWR 2005TA-0500726 spp)kafion.wpd <br />