Laserfiche WebLink
Nw = 103 mg N/L: 20%reduction from the septic tank =(1-0.2)103 =82 mg N/L <br /> d = Assume 15%due to the fine-grained soil at the potential soil-effluent interface soil chemistry results. <br /> R = 12 in/yr. <br /> Nb= Assumed to he 0.1 ppm NO3-N <br /> 0.036 in/yr(82 ma N/L) (1 -0.15)+(12 in/yr x 0.1 mg/L) <br /> Nr = (0.036 in/yr+ 12 in/yr) <br /> Nr 1.4 ppm itrate as nitrate(NO3) <br /> The c ated nitrate loading concentration in the recharge effluent from the new modular building is <br /> calculated to be under the Maximum Contaminant Level limit for nitratg water. The variables <br /> used in the calculations above are conservative. For example,the ADF 84 g s/day is assumed 365 days <br /> per year. Secondly,the use of 103 mg N/L,is a much higher nitrogen c ncen tion than those <br /> concentrations published from household or domestic sources. Various researchers place the nitrogen <br /> reduction occurring in septic tanks at 10%to 20%. From the May 8,2003 Symposium"Onsite Wastewater <br /> Treatment -Nitrogen Removal,"Dr. Stuart Oakley of Chico State University states that"approximately <br /> 20%of the total nitrogen generated is removed in the septic tank." <br /> IV. WASTEWATER DISPOSAL SYSTEM <br /> OPERATIONAL PARAMETERS <br /> Septic Tank Sizing <br /> Since the new modular building will be elevated,influent can gravity flow into a 1,200 gallon septic tank <br /> that is installed at grade. The effluent can then gravity flow from the tank into the disposal area structure. <br /> The EHD will require that two-to-three inches of soil is placed over the tank to mitigate odors. <br /> The tank may have to be pumped on a prescribed interval basis depending on direct observations of paper <br /> and scum accumulation;e.g.,every six months to every three years,depending on sludge/scum <br /> accumulation to be determined by a septic system contractor. <br /> Peaking factors for septic tanks vary with usage during the hour of the day,and day of the week,with peak <br /> hourly rats associated with normal working hours. The ratio of the peak day to the average day can vary <br /> from 1.5 to>5, depending upon the usage. A peaking factor of 2.5 (average between 0 and 5)will be used <br /> in the calculation below: <br /> Septic Tank Hyd lic Detention Time <br /> Detention Time 12,00 septic tank ca ac' 'x 0.70 30% volume lost to sludge/scum accumulation / <br /> Factoryz 84 gals/day ADF <br /> Detention Time d 4.00 d4. The minimum acceptable detention time is 1.0 days. <br /> Therefore, a 1,2W-gailbh septic tank is adequate for the new modular building. <br /> Primary and 100% Replacement Filter Bed Areas for the new Modular Building <br /> The filter bed area is calculated in the procedure described in Section 8.7 of the San Joaquin County Sewage <br /> Standards and EHD Document 42-01-004 Calculation Requirements for Commercial Septic Systems: <br /> Base Tank Capacity(BTC)= 1,200 gals <br /> 8 <br />