Laserfiche WebLink
S = Sufficient <br /> 1 = Insufficient <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ❑ 6.1 Site map <br /> ,.ssho�winng the location,with concise and accurate dimensions of the percolation test holes on the parcel. <br /> I� ❑ 6.2 The m- Mfmum number of shallow and deep percolation tests was performed for each parcel. <br /> -11 <br /> ry ❑ 6.3 Description of the date,time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation of hole, and depth of water used to presoak(minimum 12 inches). <br /> Q E] 6.4 Description of the date, time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br /> depth to Iter remaining in hole, etc.) <br /> ® ❑ 6.5 The test conformed to SJC Policy EHD 02-02(correct depth, diameter, 7'gravel, 6"water refill, correct readings <br /> recorded). 5 <br /> 0 ❑ 6.6 Complete Percolation Test Form (including readings)was provided with REHS verification signature. The rate <br /> was correctly calculated using the last reading. <br /> R [j6.7 Discussidn d al y potential problems predicted and/or the need for an engineered or alternative septic system. <br /> W] ❑ 6.8 Discuss)of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> 7.0 CONCLUSION SECTION <br /> �- ❑ .1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed B cA � <br /> y: CSCA 5 Reviewed Date:14 <br /> EHo 26-02-003 Page 2 of 3 Soil Suitability Checklist <br />