Laserfiche WebLink
191 <br /> V <br /> FAXED APRT.5,2001 w 1 n A A 4 <br /> SAN JOAQUIN COUNTY - <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> P.O.BOX 2009 - <br /> STOCKTON,CA 95201 <br /> 304EAST WEBERAVE. <br /> THIRD FLOOR <br /> STOCKTON,CA 95202 <br /> (209)468-3420 <br /> PAX;(209)464-013 8 - <br /> PROJECT: WINE TANK FOUNDATIONS <br /> BEAR CREEK WINERY - <br /> FILE;01-027 <br /> ATTN:MR.MIKE HUGGINS;(209)46.8-3437 . <br /> THIS LETTER IS TO ADDRESSICLARIFY/CONF1RM A REQUEST BY OUR FIRM FOR YOUR <br /> ASSISTANCE WITH YOUR DEPARTMENT'S APPROVAL OF THE ABOVE PROTECT. PLEASE <br /> NOTE THE FOLLOWING: <br /> L ON 04104/01.,APVANCED DESIGN GROUP,OURAGENT,MET WITH MS-LINDA TURKATTE <br /> TO GET YOUR,DEPARTMENTS APPROVAL FOR A BUR.DING PERMIT FOR THE ABOVE <br /> PROJECT WATCH PERTAINS TO ONLY A FOUNDATION SYSTEM FOR THE ABOVE PROJECTS <br /> TANKS. AT SUCH TIME WE WERE MADE AWARE OF YOUR DEPARTMENT'S R13QUIREMENT <br /> THAT ITEM#A&#B OF YOUR 03/02199 LETTER FOR UP-99-01 MUST BE MET_ SINCE YOUR <br /> DEPARTMENT 03102199 LETTER DID NOT HAVE A TIME FRAME AS TO WHEN THESE ITEM <br /> WERE TO BE PREFORMED WE WERE OF THE OPMON THAT THEY WOULD BEST BE <br /> ADDRESSED WREN A SEPTIC SYSTEM FOR THE PROJECT WOULD BE WARRANTED. <br /> 2: PLEASE NOTE THAT WE HAVE ALREADY ADDRESSED ITEM#B OF YOUR 03102!49. <br /> LETTER THAT PERTAIN TO THE SITE'S WATER WELL. IN ADDITION WE HAVE <br /> RECONFIRMED WITH MS.ADRIENNE ELLSAESSER,.TODAY,THAT YOUR DEPARTMENT'S <br /> FILE FOR THE PROJECT'S SITE DOES HAVE T. ITEM ADDRESSED. <br /> 3. PLEASE NOTE THAT ADVANCED DESIGN GROUP HAS CONTACTED NEIL O.ANDERSON& <br /> ASSOCIATES,MR.DAVE WELCH,TODAY AND HAS CONFIRMED THAT WITH REGARD TO . <br /> ITEM#A OF YOUR031O2199 LETTER RBGARDING A SOIL SUITABILITY STUDY!NITRATE <br /> LOADING STUDY;IT'SEOUTA$S FEASIBLE TO PERFORM TITS STUDY AND HAVE IT <br /> SURMTTTSD TO YOUR DEPARTMENT FOR REVIEW WITHIN(6)WEEKS. ' <br /> 4. AT PRESENT THE WINERY HAS AN URGENT NEED FOR THE ABOVE PROJECT TO BE <br /> COMPLETED FOR THE FALL CRUSH AND WE NAVE DETERMINED WITH THE PROJECT'S <br /> CONTRACTORS THAT OUR TIME FRAME.FOR"COMPLETION IS AT ITS LIMITS. WE NEED TO <br /> PROCEED ON CONSTRUCTION AS SOON AS POSSIBLE. <br /> 11900 NORTH FRHHY HOER + LORI. CHLIFRRNIR, USO 95240 + 209-368-3113 - FHM 209-36R-30RS <br /> EF1RI6 pe0rcreehWincrq(gphotmal-com <br />