Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO. 71-37 -4- <br /> BEAR CREEK WINERY <br /> SAN JOAQUIN COUNTY <br /> submitted to the Board by the I" day of the second month after the quarter(i.e. the January-March <br /> quarter is due by May V) each year. The Quarterly Report shall include the following: <br /> 1. A narrative description of all preparatory, monitoring, sampling, and analytical testing activities <br /> for the groundwater monitoring. The narrative shall be sufficiently detailed to verify compliance <br /> with the WDR, this MRP, and the Standard Provisions and Reporting Requirements. Field logs <br /> shall support the narrative for each well documenting depth to groundwater;parameters <br /> measured before, during, and after purging; method of purging; calculation of casing volume; <br /> and total volume of water purged. <br /> 2. Calculation of groundwater elevations, an assessment of groundwater flow direction and gradient <br /> on the date of measurement, comparison of previous flow direction and gradient data, and <br /> discussion of seasonal trends if any. <br /> 3. A narrative discussion of the analytical results for all media and locations monitored including <br /> spatial and temporal tends, with reference to summary data tables, graphs, and appended <br /> analytical reports (as applicable). <br /> 4. Summary data tables of historical and current water table elevations and analytical results. <br /> 5. A scaled map showing relevant structures and features of the facility, the locations of monitoring <br /> wells and any other sampling stations, and groundwater elevation contours referenced to mean <br /> sea level datum. <br /> 6. Copies of laboratory analytical report(s) for groundwater monitoring. <br /> In reporting monitoring data, the Discharger shall arrange the data in tabular form so that the date, <br /> sample type (e.g., effluent, pond, groundwater well, etc.), and reported analytical result for each sample <br /> are readily discernible. The data shall be summarized in such a manner to clearly illustrate compliance <br /> with waste discharge requirements and spatial or temporal trends, as applicable. The results of any <br /> monitoring done more frequently than required at the locations specified in the Monitoring and <br /> Reporting Program shall be reported in the next scheduled monitoring report. <br /> The Discharger shall implement the above monitoring program as of the date of Order. <br /> ,4 <br /> GAOV M. CARLTON <br /> 25 September 2000 <br /> 9/25 o o (Date) <br />