Laserfiche WebLink
•.i <br /> MONITORING AND REPORTING PROGRAM NO.71-37 -3- <br /> BEAR CREEK WINERY <br /> SAN JOAQUIN COUNTY <br /> Constituents Units Type of Sample Sampling and Reporting Frequency <br /> Total Dissolved Solids mg/l Grab Quarterly <br /> Specific Conductivity gmhos/cm Grab Quarterly <br /> pH pH units Grab Quarterly <br /> Standard Minerals mg/l Grab Ann <br /> Volatile Organic Analysis to be performed by EPA Method 8010 or other analytical method a ed y BOd ff. <br /> 2 Standard Minerals shall include the following compounds: Calcium,Magnesium,Sodium, oride, t ate, ate, <br /> Total Alkalinity(including alkalinity series),and Hardness. /t , <br /> REPORTING [vJ <br /> In reporting monitoring data, the Discharger shall arrange the da to u s th a date, <br /> sample type (e.g., effluent, groundwater, etc.), and reported ana i a su f ch ample are readily <br /> discernible. The data shall be summarized in such a manner to c e u at c pHance with waste <br /> discharge requirements and spatial or temporal trends, plica e. he u of any monitoring done <br /> more frequently than required at the locations speci d ' e Mo 'to eporting Program shall <br /> be reported in the next scheduled monitoring rep . . <br /> As required by the California Business an to to s C de Sections 6735, 7835, and 7835.1, all <br /> Groundwater Monitoring Reports shall e p d un er a direct supervision of a Registered Engineer <br /> or Geologist and signed by the registere pr si al. <br /> A. Monthly Monitoring po <br /> Monthly reports shall be bmi edth R gio al Board on the 1St day of the second month following <br /> sampling (i.e. the J ary R o i ue b arch). Monthly reports for the months of March, June, <br /> September, and D em y e sub as part of the Quarterly Monitoring Report, if desired. At <br /> a minimum, there ort al ncl d <br /> I. ults o ue eac d, and application area monitoring. <br /> 2. st e nt cri ing conditions at Pixley Creek and crop growth in the application area. <br /> 3. If eq ed y staff, copies of laboratory analytical report(s). <br /> 4. Ac ib r on log verifying weekly calibration of all monitoring instruments and devices used to <br /> per the prescribed monitoring program. <br /> B. Quarterly Monitoring Reports <br /> The Discharger shall establish a quarterly sampling schedule for groundwater monitoring such that <br /> samples are obtained approximately every three months. Quarterly monitoring reports shall be <br /> submitted to the Board by the I" day of the second month after the quarter (i.e. the January-March <br /> quarter is due by May 1St) each year. The Quarterly Report shall include the following: <br />