My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002206
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FURRY
>
11900
>
2600 - Land Use Program
>
UP-99-01
>
SU0002206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:06 AM
Creation date
9/4/2019 6:45:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002206
PE
2626
FACILITY_NAME
UP-99-01
STREET_NUMBER
11900
Direction
N
STREET_NAME
FURRY
STREET_TYPE
RD
City
LODI
Zip
95240
APN
06116026
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
11900 N FURRY RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FURRY\11900\UP-99-01\SU0002206\APPL.PDF \MIGRATIONS\F\FURRY\11900\UP-99-01\SU0002206\CDD OK.PDF \MIGRATIONS\F\FURRY\11900\UP-99-01\SU0002206\EH COND.PDF \MIGRATIONS\F\FURRY\11900\UP-99-01\SU0002206\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT m Use Permit <br /> Application Information <br /> Owner: Goldstone Land Company <br /> Applicant: Bear Creek Winery <br /> File Number: UP-99-1 <br /> Location: On the east side of Furry Road,between Armstrong Road and Live Oak Road, <br /> southeast of Lodi <br /> Address: 11900 North Furry Road,Lodi <br /> General Plan: A/G Community: — <br /> Zoning: AG-40 APN: 061-160-02,25,26 <br /> Project Size: 113.5 acres Parcel Size: 113.5 acres <br /> Water Supply. Well Sewage Disposal: Septic system <br /> Storm Drainage. Retention basin 100-Year Flood: No <br /> Williamson Act: No Supervisorial District: 4 <br /> Staff: Kerry Sullivan CEQA Determination Negative Declaration <br /> Project Description <br /> This is a Use Permit application to expand an existing winery in phases over a ten-year period. The <br /> proposed improvementsand timing of said improvementsare as follows: <br /> Construction <br /> Improvements Schedule <br /> (Year) <br /> Al 46,100-sq.-ft.barrel warehouse& (10)9,000-gallon storage tanks 2004 <br /> A2 48,000-sq.-ft.barrel warehouse expansion 2008 <br /> A3 13,000-sq.-ft.barrel warehouse expansion 2010 <br /> B 6,400-sq.-ft.administration building 2005 <br /> C 152,400-sq.-ft. case goods warehouse/bottling building and (10) 18,000-gallon <br /> storage tanks 2010 <br /> E 12,500-sq.-ft,maintenance building 2001 <br /> G 44,800-sq.-ft.press/fermentorbuilding 2007 <br /> R1 12,000-sq.-ft.refrigeration system 2003 <br /> R2 10,500-sq.-ft.refrigeration addition 2008 <br /> T1 (60)22,000-galIon storage tanks 2004 <br /> T2 (6) 5,000-gallon break down tanks 2000 <br /> T2 (4) 1,000-gallon breakdown tanks 2000 <br /> T3 (40)22,000-gallon storage tanks 2008 <br /> T4 (168)215,000-gallon storage tanks 2010 <br /> The letters used to denote the above improvements are consistentwith the designations on the project's Site <br /> Plan. The bulk of operations will occur during the harvest,from July 15 through October 15. During this time, <br /> San Joaquin County UP-99-1\Goldstone <br /> Community Development Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.