Laserfiche WebLink
)!TONAL INFORMATION REQIENTS <br /> BEAR CREEK WINERY <br /> LODI,SAN JOAQUIN COUNTY <br /> 1) Provide a flow diagram of the wastewater generation and treatment system. Include a map <br /> showing the locations of all treatment equipment, clarifiers, sumps, or pump stations. <br /> Describe procedures to control contaminants in the wastewater streams and in the wastewater <br /> ponds. <br /> 2) Describe the existing and proposed wastewater disposal system, all land application areas, and <br /> any changes that you are proposing. Show the locations of all existing/proposed land <br /> application areas on a topographic map. Staff is concerned that the low level of treatment <br /> prior to discharge will result in inadequately treated wastewater commingling with stormwater <br /> which then migrates out of the land application areas. Please address this issue. <br /> 3) If surface impoundments will be used to store wastewater or regeneration brine, provide <br /> diagrams and a description of the planned impoundment, location, size and depth, construction <br /> materials, inlet and outlets, depth to groundwater below the bottom of the pond, and existing <br /> or planned groundwater monitoring wells. If stormwater ponds exist,have they ever <br /> overflowed? <br /> 4) Allowing for two feet of freeboard, what is the approximate storage capacity of any planned <br /> wastewater ponds? Provide a water balance that evaluates the containment structures ability <br /> to provide sufficient capacity on a month by month basis. Include monthly evaporation, <br /> precipitation, and irrigation rates as well as monthly discharge volumes. Rainfall shall be <br /> based on the 100-year return period total annual precipitation. <br /> 5) Please resubmit the loading calculations using both crush and non-crush flow rates and <br /> contaminant concentrations. Present loading rates for BOD (in lbs/acre-day), total nitrogen(in <br /> lbs/acre-year), and dissolved solids (in lbs/acre-year). Provide a description of the disposal <br /> areas and the disposal technique. State the number of acres of land used for disposal and crops <br /> planned for application areas (show locations of land on map). Describe harvesting and crop <br /> disposal procedures. Describe the mixing ratio of wastewater and supplemental irrigation <br /> water prior to application, and describe the tailwater control and return system. (Note: <br /> Discharge of wastewater to fallow land is not an acceptable method of disposal). <br /> 6) Describe the existing wastewater disposal system, and any changes that you are proposing. If <br /> possible, show that this method of disposal will not impact the quality of the underlying <br /> groundwater otherwise, describe proposed changes to the system. <br /> 11/19/2001 <br /> c.wnM fawvew..c�w�ww.k <br />