My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006516
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
14210
>
2600 - Land Use Program
>
PA-0700170
>
SU0006516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:39 AM
Creation date
9/4/2019 6:45:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006516
PE
2631
FACILITY_NAME
PA-0700170
STREET_NUMBER
14210
Direction
W
STREET_NAME
STATE ROUTE 4
City
STOCKTON
APN
13112004
ENTERED_DATE
4/17/2007 12:00:00 AM
SITE_LOCATION
14210 W HWY 4
RECEIVED_DATE
4/16/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\HWY 4\14210\PA-0700170\SU0006516\APPL.PDF \MIGRATIONS\F\HWY 4\14210\PA-0700170\SU0006516\CDD OK.PDF \MIGRATIONS\F\HWY 4\14210\PA-0700170\SU0006516\EH COND.PDF \MIGRATIONS\F\HWY 4\14210\PA-0700170\SU0006516\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-07-170 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is$194.33 per additional daily trip-end generated in <br /> the Delta area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. <br /> 4. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is$780.00 per 1000 gross square foot of building <br /> designated as Industrial. The fee is based on the current schedule. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG:av <br /> P\COAAffitfS\Cu.�TEFfPL M\CO,NZ. SA0 pd <br />
The URL can be used to link to this page
Your browser does not support the video tag.