My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002802
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
24305
>
2600 - Land Use Program
>
SA-98-26
>
SU0002802
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:38 AM
Creation date
9/4/2019 6:45:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002802
PE
2633
FACILITY_NAME
SA-98-26
STREET_NUMBER
24305
Direction
E
STREET_NAME
STATE ROUTE 4
City
FARMINGTON
ENTERED_DATE
11/1/2001 12:00:00 AM
SITE_LOCATION
24305 E HWY 4
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\F\HWY 4\24305\SA-98-26\SU0002802\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o P4y!N..p <br /> 2: ? <br /> c <br /> siri:o+t' <br /> SITE APPROVAL <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 EAST HAZELTON AVENUE, STOCKTON, CA 95205 <br /> TELEPHONE: (209) 468-3120 <br /> BUSINESS HOURS: 8:00 a.m. to 12 p.m.1 2:00 p.m. to 5:00 p.m. <br /> (Monday through Friday) <br /> APPLICATION:PROCESSING STEPS <br /> STEP 1 CHECK WITH STAFF - Oevelopment Services Staff will explain the requirements and procedures to you. <br /> STEP 2 SUBMIT YOUR APPLICATION - Applications are accepted by appointment only. Calt488-3120 for an <br /> appointment When you apply,file all of the following: <br /> • FEE The staff will let you know the current cost of filing an application. Make checks payable to the San <br /> Joaquin County Treasurer. <br /> • FORM Seven(7)copies of the completed application information forms(attached)which all owners must <br /> sign. <br /> • SITE PLAN Seven(7)copies of a folded Site Plan(see attached)and two(2)copies of an 8-7/2' x 11"reduced <br /> copy of the plan. <br /> • HAZARDOUS One copy of a completed Hazardous Materials Disclosure Survey form(a copy of the form Is <br /> MATERIALS attached). <br /> • OEED One copy of the recorded deed(s)of the property. <br /> • SERVICES If your project requires connection to public facilities,you must submit a'will-serve"letter from <br /> the appropriate water,sewer and drainage entities at the time of filing. This letter must include a <br /> statement from the agency that they will serve the proposed development and has,or will have, <br /> the capacity to provide such service. <br /> • APPLICATION Staff will check your application. If anything is missing,you will be notified in writing. The <br /> COMPLETE applicant will be sent a postcard once the application has been determined complete. !Your <br /> application cannot be processed until It Is complete.) <br /> STEP 3 APPLICATION PROCESSING <br /> • CEQA The County will decide if the proposal will have an adverse effect on the environment If there are <br /> no adverse effects,the application will be processed. If there are potential adverse effects,further <br /> environmental review will be required. Projects that have the potential to adversely affect the <br /> environment will require the preparation of an E.I.R. This may extend the processing time. <br /> • REFERRALS AND Staff will refer the application to any County departments,other agencies and surrounding <br /> ACTION property owners affected by your proposal. At the end of a review and comment period the staff <br /> will approve your application if they can make required findings. If the staff cannot make the <br /> required findings,the application will be denied. Typically action will be taken on the project within <br /> 7-8 weeks. <br /> • FINAL ACTION The action of the staff can be appealed to the Planning Commission. The staffs action Is final <br /> unless appealed. For further Information on the length of the appeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The staff will send you the final action and if It Is approval it will list conditions,by department,that <br /> must be met before you can start your project <br /> • IMPROVEMENT In addition to the Site Plan,an Improvement Plan is frequently required as a condition of approval. <br /> PLANS This is an engineered plan showing drainage,grading,frontage improvements,access,on.and off. <br /> site service and utility facilities,landscaping and circulatioNparking details. <br /> • DRIVEWAY Driveway Permits must be acquired from Community Development Department for any work <br /> PERMITS performed within the road right of way. If the project fronts on a stab highway these permits are <br /> obtained from Caltrans. <br /> • SANITATION& Projects that will utilize new on-site sanitation disposal and/or on-efte wells,must get permits from <br /> WELL PERMITS the Environmental Health Division. <br /> • BUSINESS If the project involves a business,a Business License must be approved prior to starting <br /> LJCENSES operation. Business License applications can be processed concurrently with the Site Approval <br /> application. <br /> • BUILDING If the project involves construction a building permit must be approved prior to commencement of <br /> PERMITS work. <br /> • OTHER PERMITS Frequently other local,state andfor federai agencies will require permits prior to new uses being <br /> established(e.g.Air Pollution Control DlstrfcL Regional Water Quality Control Board or the <br /> Sheriffs Office). The Commenity tlevelppm.^nt De— --bmm-will idanp y addaional permits we are <br /> aware of that may be required for your project <br /> PA_SAFRM ev July; is" <br />
The URL can be used to link to this page
Your browser does not support the video tag.