Laserfiche WebLink
ip <br /> APPLICATION - LOT LINE ADJUSTMENT <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA 18002 1 3 <br /> TO BE COMPLETED BY THE APPLICANT PRIOR TO FILING THE APPLICATION <br /> Owner Information Engineer/Applicant Information <br /> Name: Herman Boone Name: Dillon& Murphy, Go Joe Murphy <br /> Address: PO Box 1 Address: PO Box 2180 <br /> Farmington, CA 95230 Lodi, CA 95241 <br /> Phone: 209-886-5553 Phone (209)334-6613 <br /> PROJECT DESCRIPTION <br /> Proposal <br /> Description of the proposed project: To realign two existing parcels from their existing configuration such that Lot 1 gains a <br /> portion of Lot 2 property. <br /> PROPERTY AND VICINITY DESCRIPTION <br /> Property Information <br /> Assessor Parcel Number(s) Property Size Number of Existing Project Size Williamson Act Contract <br /> Parcels <br /> 187-040-29, 187-040-17 1 18.4 AC 2 18.4 AC ❑Yes ®No <br /> Property Address: 24465 and 24621 E. State Rte 4, Farmington, CA <br /> Existing Land Uses <br /> On-Site Uses(Include Ag Crops): Agriculture and Residential <br /> Uses to the North: Agriculture <br /> Uses to the East: Agriculture <br /> Uses to the South: Agriculture <br /> Uses to the West: Bare Ground <br /> Project#1877 <br /> F:\DEVSMPlanning Application Forms\ Page 3 of 7 <br /> Lot Line Adjustment.doc.(Revised 05-11-09) <br />