My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
6250
>
2900 - Site Mitigation Program
>
PR0542086
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 12:03:21 PM
Creation date
9/5/2019 9:23:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542086
PE
2965
FACILITY_ID
FA0004502
FACILITY_NAME
NORMANS NURSERY
STREET_NUMBER
6250
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09317009
CURRENT_STATUS
02
SITE_LOCATION
6250 ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F4 <br /> KLE/NFELDER <br /> 6119M—,*.Pi9t Saluuom. <br /> • 5. The dewatering wells were spaced approximately 75 feet apart extending north to <br /> south. The three dewatering wells (DW-1, DW-2, and DW-3) were installed to total <br /> depths of 20 (DW-2 and DW-3) and 30 feet (DW-1) below the ground surface (bgs). <br /> The dewatering wells were made operational during the third quarter of 2002. <br /> Discharge from the dewatering wells is directed to Basin B where it undergoes <br /> dentrification along with the other tailwater within the basin. <br /> Daily and weekly surface water and rainfall monitoring has been ongoing since the <br /> MRP was required by the RWQCB in 1997. Quarterly groundwater monitoring of the <br /> onsite shallow and deep monitoring wells has also been ongoing since installation <br /> (1997 and 1999, respectively) in accordance with the MRP. The results of historical <br /> groundwater monitoring at the site are summarized in the Tables and Charts section of <br /> this report. Based on the monitoring results, the RWQCB has been working on a <br /> revised MRP for Norman's Nursery since 2007. <br /> • <br /> • <br /> 117226.E021STO12R0696 Page 17 of 43 September 14, 2012 <br /> Copyright 2012 Kleinfelder <br />
The URL can be used to link to this page
Your browser does not support the video tag.