Laserfiche WebLink
Patterson Pass Business Park#6-Tracy,CA Pond,Robinson&Associates,LP <br /> Property Condition Assessment Project No.051928 <br /> SECTION 4.0-Table of Opinions of Cost for Recommended Work Items <br /> Item Total,Over current the Term Work Items Anticipated Work Items <br /> Description Opinion of Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8Year 9 Year 10 <br /> Cost 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 <br /> Apply slurry seal coat and restripe <br /> asphalt pavement on a four-year <br /> schedule,allowing for crack sealing $ 16,000 $8,000 $8,000 <br /> and minor repairs,beginning in <br /> Year 1. Estimate based on 8,000 <br /> SYx$1 per SY. <br /> Anticipate the need to repaint <br /> concrete tilt wall building exteriors S 82,000 $41,000 <br /> with an elastomeric coating. $41,000 <br /> Estimate 41,000 SF at$USE. <br /> Remove and re-seal the tilt wall <br /> concrete panel joints. Estimate $ 6,500 $6,500 <br /> based on replacing approximately <br /> 1,600 LF x$4/LF. <br /> Perform annual roof maintenance, <br /> including cleaning around roof <br /> Maint. <br /> drains. <br /> Maintenance <br /> Restripe asphalt pavement on an <br /> annual basis and make minor <br /> Maint. <br /> pavement repairs. <br /> Maintenance <br /> Perform annual maintenance on tilt <br /> wall concrete panel joint sealants, <br /> pavement to building joint sealants <br /> and sidewalks to buildingjoint Maint. <br /> selants. <br /> Maintenance <br /> TOTALS 2005 Dollars $ 104,500 $ - $ 47,500 $ $ 8,000 $ $ $ $ 8,000 $ 41,000 $ <br />