Laserfiche WebLink
� v <br /> ProLogis Pond,Robinson&Associates,LP <br /> Patterson Pass Business Park#6-Tracy,CA Project No.051928 <br /> February 2005 Page 3 <br /> We observed during our site visit that the existing parking appears to adequately satisfy the <br /> needs of the current work force employed at the subject property at the time of our site visit. The <br /> workforce from the building located west of the subject building is overflowing onto the subject <br /> building parking. Property management reported that the tenants of the neighboring building <br /> will be moving because their workforce has overgrown their parking capacity. <br /> The site contains a total of 4 accessible parking spaces,each located near the main building <br /> entrances on the east side of the building. Based on a total of 69 parking spaces provided, a total <br /> of 3 accessible spaces reserved for the disabled must be provided; of which one must be van <br /> accessible. The size, access aisles, slope, cross slope, curb ramps, location and signage of the <br /> provided accessible parking spaces appear to comply with the requirements of the ADAAG and <br /> California Universal Design and Accessibility Code guidelines. <br /> Number and Type of Buildings: <br /> The property is developed with one office/warehouse/distribution building. The building exterior <br /> is constructed with exterior load-bearing concrete tilt-up wall panels. The interior framing consists <br /> of square steel tube columns, steel girders and open-web steel joists with timber sub-purlins and <br /> oriented strand board(OSB)wood roof deck. The lateral forces are resisted by the perimeter <br /> concrete tilt-walls. The warehouse roof is a built-up roof with a granular surfaced modified <br /> bitumen cap sheet. Approximately 40 deck penetrating skylights exist throughout the roof system. <br /> Roof surfaces are sloped at approximately 1/4-inch per foot from the center ridge towards the east <br /> and west roof edges with interior deck penetrating roof drains and overflow scuppers to provide <br /> roof drainage. <br /> Number of Stories: <br /> The building is one story in height,approximately 30' above the finished floor elevation. Building <br /> height above adjacent ground surfaces varies depending on the presence of loading docks or at- <br /> grade areas. Sixteen conventional 4 foot high with 9' by 10' door loading docks are provided at the <br /> east elevation of the building as well as four 12'by 14' door ramped loading docks. No loading <br /> docks are provided on the north, south or west elevations of the building. Several at-grade typical <br /> 3' by 7' personnel doors are provided on each building elevation. The minimum estimated interior <br /> clear height is 24 feet. The finished office areas contain 8 feet of interior clear height. <br /> Approximate Percentage of Office Area: <br /> Based on information provided by Ms. Katherine Tani,the building contains a total footprint of <br /> 92,400 SF. The tenant improvements include front office areas containing approximately 6,283 <br /> SF (6.8%). Remaining building areas are used for shipping,receiving, warehouse storage and <br /> repair shop, containing a combined total of approximately 86,117 SF. <br /> Percentage of Occupancy: <br /> The building is currently occupied by two tenants, Bunzl California, Inc and enXco. <br />