My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004404
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GATEWAY
>
25521
>
2600 - Land Use Program
>
SA-01-62
>
SU0004404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:46 AM
Creation date
9/5/2019 10:39:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004404
PE
2632
FACILITY_NAME
SA-01-62
STREET_NUMBER
25521
Direction
S
STREET_NAME
GATEWAY
STREET_TYPE
BLVD
City
TRACY
ENTERED_DATE
5/19/2004 12:00:00 AM
SITE_LOCATION
25521 S GATEWAY BLVD
RECEIVED_DATE
9/4/2001 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GATEWAY\25521\SA-01-62\SU0004404\APPL.PDF \MIGRATIONS\G\GATEWAY\25521\SA-01-62\SU0004404\CDD OK.PDF \MIGRATIONS\G\GATEWAY\25521\SA-01-62\SU0004404\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-62 <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards CW-Cl l prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $710.00 per <br /> 1,000 gross square foot of building designated as Manufacturing. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. A credit may be allowed upon receipt of a <br /> letter from Kings and Lions for existing improvement. The 5 percent administration fee <br /> shall be paid to the Department of Public Works prior to release of the plans from the <br /> building department. <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> GK:sh <br />
The URL can be used to link to this page
Your browser does not support the video tag.