Laserfiche WebLink
,qqSAN JOA QUIN CO-FT NTY <br /> �'co� v wr <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 304 East Weber Avenue, Third Floor, Stockton, California 95202-2708 <br /> April 17 2007 <br /> To: San Joaquin County Community Development Department <br /> From: San Joaquin County Environmental Health Departm t <br /> Contact Person: Amanda Boertien, R.E.H.S.,Phone: (209) 458-052 <br /> RE: PA-0740114 (MS), SU0006489 Attention: Jason Jones <br /> 16511 S. Gillis Road, Stockton <br /> The San Joaquin County Development Title Requirements listed below have been identified as pertinent <br /> to this project. Other requirements may also apply. These requirements cannot be modified_ <br /> j A. A qualified environmental professional shall prepare a surface and subsurface contamination report, <br /> identifying any potential source of surface or subsurface contamination caused by past or current land <br /> uses. The report shall include evaluation of non-point source of hazardous materials, including <br /> agricultural chemical residues,as well as potential point sources, such as fuel storage tanks, septic <br /> systems, or chemical storage areas. The report shall be submitted to the Environmental Health <br /> Department at time of submittal of a tentative map(San Joaquin County Development Title, Section <br /> 9-905.12). <br /> j A review fee of$190.00 shall be paid at the time of submittal to the Environmental Health <br /> Department. <br /> B. The Environmental Health Department requires a soil suitability study indicating that the area is <br /> suitable for septic system usage. This must be performed prior to recordation of Parcel Map(San <br /> Joaquin County Development Title, Section 9-1105.2(d)). A review fee of$190.00 must be paid at <br /> time of submittal to the Environmental Health Department. <br /> The sewage disposal system shall comply with the on site sewage standards of San Joaquin County <br /> prior to approval. A percolation test that meets absorption rates of the manual of septic tank practice <br /> or E.P.A. Design Manual for onsite wastewater treatment and disposal system is required for each <br /> parcel. A permit fee of$95.00 per percolation hole is required. <br /> C. The existing private water wells shall be tested for the chemical Dibromochloropropane(DBCP)and <br /> nitrates prior to recordation of the Parcel Map. Samples are to be taken and analyzed by a State- <br /> approved laboratory (San Joaquin County Development Title, Section 9-1115.7). <br /> D. Construction of individual sewage disposal system(s)under permit and inspection by the <br /> Environmental Health Department is required at the time of development based on the Soil Suitability <br /> Study findings (San Joaquin County Development Title, Section 9-1110.3 & 9-1110.4). <br /> E. Construction of an individual domestic water well under permit and inspection by the Environmental <br /> Health Department is required at the time of development(San Joaquin County Development Title, <br /> Section 9-1115.3). <br />