Laserfiche WebLink
Mr. Norgard indicated that the Environmental Health Division would have no conditions <br /> to impose on this application provided that the truck parking will not take place on the <br /> septic system and replacement area. <br /> The applicant was informed that any storm-water drainage created by new improvements <br /> shall be retained on-site. The applicant was also informed that all parking spaces, <br /> driveways, and maneuvering areas shall be surfaced and permanently maintained with <br /> base material of appropriate depth and asphalt concrete. <br /> Mr. Martin informed the applicants that the Planning Commission meeting will be held <br /> on April 19, 2000, and that staff will be recommending approval providing the conditions <br /> are met. <br /> -------------------------------------------------------------------------- <br /> 3:00P.m. 9. USE PERMIT APPLICATION NO.UP-01-4 OF STUDLEY <br /> CM COMPANY (CIO FOODPRO INTERNATIONAL,INC.). A <br /> Use Permit application to construct a watering pond <br /> (approximately 8 acres) as part of an olive processing facility on <br /> the adjacent property. Located on the south side of Via Nicolo <br /> Road, 3,000' west of Hansen Road, west of Tracy(APN: 251-320- <br /> 08; Address: 18900 W. Patterson Pass Road, Tracy). <br /> Chandler Martin, Senior Planner;Ben Hall, Musco Olive Products;Edward Ma,Food <br /> Pro International; Dennis Rock,Building Division; and Ben Neely, Public Works <br /> Department were present for this item. <br /> i Chandler Martin introduced the project. <br /> Mr. Borges indicated that he would amend Public Health's conditions to require Regional <br /> Water Quality Control Boards approval. <br /> Mr. Neely informed the'applicants that a Water Course Encroachment Permit will be <br /> required. Mr.Neely asked if the drainage Swale was in the creek. Mr. Ma indicated that <br /> it is not really a creek and that they plan to reroute the drainage. <br /> Mr. Rock indicated that a grading permit will be issued when the plans are submitted. <br /> Mr. Rock also indicated that two sets of plans will be required. <br /> 3:30 p.m. 10. SITE APPROVAL APPLICATION NO. SA-00-57 OF <br /> CM DELORES HUTCHESON (CIO SUREBUILT,INC.). A <br /> Revisions of Approved Actions application for an approved Site <br /> Approval application for a trailer shop and parking facility. The <br /> revisions are to remove conditions of approval Lh.(2), which limits <br /> access on Cherryland Road, and 1.1, which requires the parcels to <br /> be merged. Located on the east side of Cherryland Avenue, 1,000' <br /> i <br />