My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011948
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18201
>
2600 - Land Use Program
>
PA-1800159
>
SU0011948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:31:38 PM
Creation date
9/5/2019 10:43:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011948
PE
2626
FACILITY_NAME
PA-1800159
STREET_NUMBER
18201
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95391-
APN
20945035
ENTERED_DATE
9/18/2018 12:00:00 AM
SITE_LOCATION
18201 W GRANT LINE RD
RECEIVED_DATE
8/26/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18201\PA-1800159\SU0011948\APPL.PDF \MIGRATIONS\G\GRANT LINE\18201\PA-1800159\SU0011948\EH COND.PDF \MIGRATIONS\G\GRANT LINE\18201\PA-1800159\SU0011948\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Electric Company' <br /> 11. Cathodic Protection: PG&E pipelines are protected from corrosion with an "Impressed <br /> Current" cathodic protection system. Any proposed facilities, such as metal conduit, pipes, <br /> service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion Engineering. <br /> 12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work. The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PG&E Gas and Electric Facilities Page 4 <br /> Internal <br />
The URL can be used to link to this page
Your browser does not support the video tag.