Laserfiche WebLink
` Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> The location of the water tank was chosen due to its close location to the water mains running along <br /> Central Parkway, the adjacent open space corridor area, and the ability to screen the facility with <br /> a landscaping associated with the Community College. <br /> 4.4.3 Implementation Measures <br /> The Land Use Plan and Facilities Plan for Specific III implements the siting criteria for the planning area. <br /> .. The community facilities will be developed as proposed on the Community Facilities Plan,any <br /> substantial relocation of the facilities will require an amendment to the Specific Plan, except that MHCSD <br /> may relocate its facilities at its discretion without amendment of the Specific Plan. <br /> 4.5 Development Design Standards and Guidelines - General <br /> 4.5.1 Master Plan Summary <br /> The overall objective for development standards is to provide a guide for all development within <br /> Mountain House,and assure a high level of quality in the construction and operation of public and private <br /> .. buildings,open space corridors and facilities. Unless addressed specifically, development standards shall <br /> be in accordance with the County Development Title,the MHCSD Design Manual, the MHCSD Standard <br /> AN. Specifications and Details,the Mountain House Development Title. Standards for street rights-of-way are <br /> found in the MHCSD Standard Specifications and Details. <br /> 4.5.2 Grading Standards <br /> ` 4.5.2.1 Master Plan Summary <br /> Grading practices within the Community are to minimize disruption to the natural topography; protect and <br /> enhance the project's aesthetics;minimise risk to health and property from improper control of storm <br /> drain water runoff,erosion and sedimentation; and provide for efficient construction operations. Areas are <br /> to be graded to ensure positive drainage and shaped in such a way as to appear an integral part of the <br /> graded or paved surface with smooth,rounded slope transitions. Storm water runoff is to be directed <br /> towards public streets,public facilities or easements and not across adjacent private property. Grading <br /> operations are to be planned and implemented to efficiently control erosion and sedimentation. The <br /> Master Plan adopted grading standards for slopes,property lines,and road improvements. <br /> Specific Plans are to provide typical grading details and grading concepts for any special conditions <br /> unique to the particular Specific Plan area. <br /> Draft 03/14/05 4-51 <br /> ........................................................................................................................................................................... <br />