Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> b. The class location designation of a pipeline should be reviewed and revised by the PUC for any high <br /> pressure gas pipelines that would be proximate to residential development. Alternative routes for any <br /> future gas pipelines easements should be identified by the developer and approved by the PUC. <br /> c. All habitable residential structures shall maintain a minimum 58 setback from the easement edge as <br /> set forth in the Specific Plan III Pipeline Risk Analysis to achieve a risk level of less than one in a _ <br /> million. <br /> d. All development shall comply with the MHCSD Emergency Pipelines Safety Plan. Prior to any <br /> construction,appropriate plans, operating procedures and safeguards shall be undertaken to insure <br /> safety in the area of fuel lines and pipelines. <br /> 6.7.2 Livestock Waste Management <br /> 6.7.2.1 Master Plan Summary <br /> To protect the environment and the public from exposure to water contamination by dairy and ranch <br /> waste,the Master Plan states that physical contact to livestock waste by the public will not he allowed. <br /> Specific Plans will address existing dairy operations within 1000 feet of proposed residential development <br /> to determine if such a development would be impacted by the proximity of the dairy operations. — <br /> 6.7.2.2 Specific Plan III Description <br /> Specific Plan III has two dairies within its planning area,one north and one south of Grant Line Road <br /> adjacent to Mountain House Parkway. Both dairies are planned for development and tentative subdivision <br /> maps have been submitted for these properties during the Specific Plan review process. It is anticipated that <br /> the dairies will be removed during the first phases of development within Specific Plan HL <br /> 6.7.2.3 Implementation Measures <br /> a. No direct drainage connection shall be made which allows nuisance runoff from existing dairies to <br /> enter into the MHCSD's public storm drainage system. — <br /> b. Prior to approval of a tentative map,the applicant shall submit plans for approval of the Planning <br /> Commission to terminate dairy and other livestock operations within the site and clean up any <br /> contamination to meet standards of the County Health Department,Regional Water Quality Control <br /> Board, and other applicable State and County standards and ordinances. — <br /> c. Dairy and other livestock operations should contain all operational and flood flows on-site. <br /> 6-8 Draft 03114105 <br /> ........................................................................................................................................................................... <br />