Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> 6.8 ELECTRIC AND MAGNETIC FIELDS <br /> 6.8.1 Master Plan Summary <br /> The Master Plan requires provision of public health information about electric magnetic fields(EMF's). <br /> EMF information will be provided to the residents and occupants of structures located adjacent to existing <br /> or proposed transmission line easements within the community.New power system facilities will be <br /> planned,designed and constructed to minimize the public's exposure to EMF's, and the community will <br /> be developed in compliance with EMF standards established by responsible state and federal regulatory <br /> agencies. Elementary and high school sites will be located an adequate distance from transmission lines to <br /> meet setback criteria adopted by the California Department of Education. — <br /> 6.8.2 Specific Plan 11 Description <br /> The PG&E Rio Oso electrical transmission line runs through Specific Plan III. As of the writing of this <br /> document,no specific EMF-related setback requirements have been established by any Local, State or <br /> Federal Agency.However, Specific Plan III implements the setbacks adopted by the Master Plan. <br /> Restrictive uses are allowed within the 50' wide power line easement pending review by PG&E <br /> Maintenance and Construction department. Although the easements are building restricted,play ground <br /> equipment properly grounded could be accepted and restrictive landscaping is allowed. Sidewalks and — <br /> trail systems as well as lighting could be implemented. <br /> 6.8.3 Implementation Measures <br /> a. Minimum setbacks will be established from the edge of the Rio Oso-Tesla powerline easement for — <br /> other uses as follows. <br /> Residential dwelling units 25 feet — <br /> Non-residential structures 10 feet <br /> Parking and storage areas No setback <br /> b. School sites shall be located an adequate distance from transmission lines easements to meet the <br /> setback criteria adopted by the California Department of Education as part of the Tentative Map <br /> approval process for each phase which contains a school facility. Easement setbacks at the time of <br /> adoption of Specific Plan III are as follows: <br /> 50-133 kV line 100 feet <br /> 220-230 kV line 150 feet <br /> 500-550 kV line 350 feet <br /> 6-12 Draft 03114/05 <br /> ........................................................................................................................................................................... <br />