Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> CHAPTER SEVEN: RECREATION AND OPEN SPACE <br /> 7.1 Introduction <br /> The recreation and open space corridor system within the Mountain House community provides for an <br /> extensive and varied system of public open spaces and recreation facilities along with private recreation <br /> and resource conservation. <br /> 7.2 Parks and Recreation <br /> 7.2.1 Recreation System <br /> 7.2.1.1 Master Plan Summary <br /> To provide the community with public and private open space areas, the Master Plan calls for a full range <br /> of recreational facilities and open space corridor areas that exceed minimum County standards and are <br /> made available to residents in a timely manner. <br /> The community shall maintain a combined community and neighborhood park ratio of not less than five <br /> .. acres per 1,000 population, and shall incorporate a comprehensive system of regional, community and <br /> neighborhood parks at locations that serve every part of the community. The park system shall provide <br /> community focal points that are accessible to residential neighborhoods and complement other <br /> community programs and create educational opportunities, as well as natural resource areas that preserve <br /> and enhance wildlife habitats and corridors. The community's bicycle and pedestrian circulation system <br /> shall establish linkages between residential areas and open space corridor destinations. <br /> As required by the Master Plan,the MHCSD has prepared the Parks, Leisure and Open Space Plan,which <br /> provides additional information on recreational planning and operations. It also supplies a definition of <br /> requirements for Conceptual,Preliminary,and Final/Construction Park Plans as used in this Specific <br /> Plan. <br /> 7.2.1.2 Specific Plan III Description <br /> The park provisions for the Specific Plan III Area are intended to meet the standards for acreage, usage, <br /> service area, access and total program as described in the Master Plan. Given the Master Plan standard <br /> for five acres of park(community and neighborhood combined)per 1,000 people, and a projected <br /> population of 7360 people,the SP III Plan Area would require 36.8 acres of community and <br /> neighborhood parks. This Specific Plan allocates 11 acres to neighborhood parks and 31 acres to <br /> ` community parks, for a total of 42 acres. A neighborhood open space corridor system has been developed <br /> for the Specific Plan III linking the Community Park, the Neighborhood Parks and the schools into a <br /> complete recreational system(Figure 7-1). The open space corridor system provides an additional 8 <br /> r <br /> Draft 03/14/05 7-1 <br /> ........................................................................................................................................................................... <br />