Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> v <br /> The 2.5-acre west neighborhood park will include a tot-lot,kids play area,picnic areas,possible game <br /> courts,and open space uses. A pedestrian trail connection will be developed to provide pedestrian access <br /> from this neighborhood park to the community park through controlled roadway intersections,where <br /> necessary. <br /> The west neighborhood park will provide for the recreation needs of the residential enclaves west of <br /> ` Central Parkway,reducing their need to cross an arterial street.The 2.5-acre park provides for passive <br /> park space with a tot-lot,picnic and open space play area.Bluff top searing will be provided overlooking <br /> the neighborhood. The gas easement that crosses the edge of the park,will become part of the open space <br /> corridor system linking the west neighborhood park to the community park and neighborhood center <br /> through a controlled intersection at Central Parkway. <br /> r <br /> 7.2.2.3 Implementation Measures <br /> a. Facilities and Design Criteria for neighborhood parks shall be consistent with the Parks,Recreation <br /> and Leisure Plan and the MHCSD Design Manual. The design of the parks should respond to the <br /> needs of neighborhood residents as surveyed by the MHCSD per their Parks,Recreation and Leisure <br /> Plan. <br /> b. Construction of neighborhood parks shall begin no later than the time at which 50%of the dwelling <br /> units for Neighborhood A/B (separate from Neighborhood D)or school attendance area,whichever is <br /> sooner, have had their final inspection. The park shall be completed no later than the time at which <br /> 6. 80%of dwelling units for the neighborhood have been issued final inspection. Completion time may <br /> be modified by the MHCSD General Manager to reflect construction and weather contingencies. <br /> c. At the discretion of the MHCSD,parks may be constructed by project applicants or the MHCSD. <br /> r <br /> The MHCSD shall be responsible for overseeing the development and phasing of parks to meet <br /> Specific Plan III requirements. <br /> d. A formal agreement for joint use of parks and recreation facilities with adjacent K-8 schools shall be <br /> required prior to construction of the park. <br /> e. Specific Plan III Neighborhood Parks shall be developed consistent with the Neighborhood Park <br /> Preliminary Plans(Fig.7-2: Specific Plan III Neighborhood A/B Park Preliminary Plan and Figure 7- <br /> 3: West Park Plan)and the Neighborhood Center Plan(Section 4.3). <br /> £ The neighborhood parks identified within Specific Plan III shall be included within the first Tentative <br /> ` Map of each applicant owning or controlling a park site. Neighborhood park sites shall be dedicated <br /> to the MHCSD or an offer of dedication to the MHCSD shall be recorded with the Final Map. <br /> Draft 03/14/05 7-7 <br /> ........................................................................................................................................................................... <br /> r <br />