Laserfiche WebLink
LMountain House Specilic Plan III <br /> ............................................................................................................................................................................ <br /> i7.2.3.3 Implementation Measures <br /> i• a. Facilities and Design Criteria for community parks shall be consistent with the Parks, Recreation and <br /> Leisure Plan and the MHCSD Design Manual. <br /> b. Construction of the community park shall begin no later than the time at which 50% of the dwelling <br /> unit permits for Specific Plan III have had their final inspection. The park shall be completed no later <br /> than the time 80% of dwelling units for Specific Plan III have had their final inspection. Completion <br /> time may be modified by the MHCSD General Manager to reflect construction and weather <br /> Lcontingencies. <br /> c. The MHCSD shall be responsible for overseeing the development and phasing of parks to meet <br /> 4 Specific Plan III requirements. <br /> L d. Programming of recreational activities shall be provided as specified in the MHCSD Parks, <br /> M Recreation and Leisure Plan. <br /> L e. A formal agreement for joint use of parks and recreation facilities between the MHCSD and the Delta <br /> + Community College District shall be required prior to approval of final maps adjacent to the <br /> Lcommunity park. If an agreement between MHCSD and the College District is not finalized by that <br /> time, then 7.0 acres will be added to the community park to result in a park size equal to 38 acres. <br /> Lf. The Community Park shall be developed generally consistent with the Community Park Preliminary <br /> Plan(Fig.7-4: Specific Plan III Community Park Preliminary Plan). The applicant shall bond for or <br /> lcommence construction of the Community Park prior to occupancy of the 1,150th residential unit <br /> L within Specific Plan III with the intent to complete the community park prior to occupancy of the <br /> 1,840th residential unit with Specific Plan III. <br /> g. Community Park land identified within Specific Plan III shall be included within the fust Tentative Map of <br /> each applicant owning or controlling land within the park site. Community Park land shall be dedicated to <br /> the MHCSD or an offer of dedication to the MHCSD shall be recorded with the Final Map. <br /> i <br /> 7.2.4 Open Spaces and Trails <br /> 7.2.4.1 Master Plan Summary <br /> A network of paths provides pedestrian and bicycle connections to open space corridor and other <br /> destinations within Mountain House and connects the community to future potential regional trail <br /> Lalignments. Signage and information shall be provided as part of this system to orient users and promote <br /> better use of the pedestrian and bicycle system.Paths within Mountain House Creek Community Park, <br /> LOld River Regional Park,Central Parkway and Great Valley Parkway shall be interconnected to provide <br /> for easy access. <br /> L <br /> LDraft 03/14/05 7-9 <br /> ........................................................................................................................................................................... <br /> L <br />