Laserfiche WebLink
College Park at Mountain Home Spedfic Plan III <br /> Mitigation Monitoring and Reporting Program <br /> implementation Implementation&Vedcadon <br /> Mitigation Measure Timing/ScheduleResponsibility Aeon Date <br /> Completed <br /> 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> c Mountain House Parkway construction <br /> The following measures shall be implemented by the <br /> College Park developers: <br /> < If the landscaping and edge treatments;required <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the out side of Moulin . <br /> House Parkway fronting the Pombo property by <br /> Specific Plans I or Ii at the time the proposed <br /> pond is developed on the Pombo property,the <br /> rerlatired landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed . <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Panic developers.In addition,the berm <br /> c ' shall be constructed by the College Park developers <br /> using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> development of the pond. <br /> m <br /> F. <br /> co <br /> M <br /> v <br />