Laserfiche WebLink
) <br /> Analysis <br /> Background <br /> On November 22, 2005,the Board of Supervisors approved the Specific Plan III project, consisting <br /> of a General Plan Amendment, a Master Plan Amendment, the Specific Plan III document, a <br /> Development Title Amendment, Development Agreements, a Williamson Act Contract Cancellation, <br /> and three Major Subdivision Applications. Included in that approval was the approval of Tentative <br /> Map Tract 3479(PA-0500144), a 119-acre parcel north of Grant Line Road and east of Prosperity <br /> Street that would be subdivided into a 347 single family Residential Medium Density(R-M)lots,two <br /> Residential Medium-High Density(R-MH)lots, industrial lots,'and an open space corridor(i.e., linear <br /> park). The two R-MH parcels would, as part of a future Major Subdivision Application, be developed <br /> as a 130 unit multi-family project. <br /> The proposed Major Subdivision Application (PA-0600641) represents a reconfiguration of the <br /> central portion of Tract 3479 with respect to the R-M and R-MH areas, and also provides for the <br /> development of the R-MH areas. As noted in the preceding section under Project Description, the <br /> expected number of R-MH units and R-M units affected by this reconfiguration would remain i <br /> unchanged. i <br /> i <br /> Finally, it should be noted that the area of Tract 3479 (including the area of the proposed <br /> residential development)was under a Williamson Act contract. In order to develop the subject <br /> property, cancellation of the contract was required. On November 22, 2005, the Board of <br /> Supervisors approved a Tentative Williamson Act Contract Cancellation, requiring that certain <br /> conditions and contingencies be met before approving a Final Williamson Act Contract <br /> Cancellation. On June 5, 2007, the Board of Supervisors approved the Final Williamson Act <br /> Contract Cancellation. <br /> Analvsis <br /> The project was reviewed for consistency with the General Plan, Mountain House Master Pian, <br /> Specific Plan III, the Mountain House Public Financing Plan, and other community plans. The <br /> project was found to be consistent with these plans. <br /> As part of this consistency review, the following matters were reviewed: 1) housing diversity.and k <br /> affordability; 2)lot and structure standards; 3)fire access road requirements; 4) police services; 5) <br /> the Development Agreement for the proposed residential development; 6)and Public Land Equity <br /> Program (PLEP)obligations. Each of these is discussed below. i <br /> Housing Diversity and Affordabilitx. ' <br /> One of the primary objectives of the Master Plan is to ensure that homes are available and <br /> affordable to employees working in Mountain House (Master Plan Objective 3.9.3 (a)). This <br /> objective is supported by policies requiring a mix of residential housing types, the availability of k <br /> affordable housing for households at every income level, and reliance on market forces to <br /> determine the number, rents, and sales prices of dwelling units within the community(Master Plan <br /> Section 3.4.1, Policy(e); Section 2.5, Goal (a) and-Objective (d); and Section 3.9.3 Policies (a) <br /> and (d)). <br /> The project would help meet the above objective and policies. As noted in the section under" <br /> "Project Description", the proposed residential development would consist of 229 homes that <br /> would be built in a variety of architectural styles and orientations. The homes would range in size <br /> 23 <br /> h <br />