Laserfiche WebLink
MITIGATION MONITORING AND REPORTING PROGRAM <br /> INTRODUCTION <br /> In accordance with the California Environmental Quality Act(CEQA), San Joaquin County(County)and <br /> Gerry N.Kamiios,LLC(GNK,LLC),prepared an environmental impact report(EIR)that identifies <br /> adverse impacts related to the College Park at Mountain House Specific Plan M Project.The EIR also <br /> identifies mitigation numsm-es that would reduce or eliminate these impacts. <br /> Section 21081.6 of the California Public Resources Code§15091(d)and 15097 of the State CEQA <br /> Guidelines require public agencies"to adopt a repairting and monitoring program for changes to the <br /> project which it has adopted or made a condition of project approval in,order to mitigate or avoid <br /> significant effects on the envirohrnent:'A Mitigation Monitoring and Reporting Program(MMRP)is <br /> required for the College Park at Mountain House Specific Plan III Project because the EIR for the project <br /> identified potentially significant adverse impacts related to construction and implementation activities, <br /> and mitigation measures have been identified to mitigate those impacts. <br /> Adoption of the IVH1W will occur along with approval of the proposed project. <br /> PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM <br /> .This MMRP has been prepared to ensure that all required mitigation measures are implemented and <br /> completed according to schedule and maintained in a satisfactory manner during the construction of the <br /> project,as required.The MMRP may be modified by San Joaquin County during project implementation, <br /> as necessary,in response to changing conditions or other refinements.A table has been prepared to assist <br /> the responsible parties in implementing the MMRP.The table identifies individual mitigation measures, <br /> monitoring/mitigation.timing,responsible person/agency for implementing the measure,monitoring and <br /> reporting procedure,and space to confirm implementation of the mitigation measures.The numbering of <br /> mitigation measures follows the.numbering sequence found in the EIR. <br /> ROLES AND RESPONSIBILITIES <br /> Unless otherwise specified herein,San Joaquin County is responsible for taking all actions necessary to. <br /> implement the mitigation measures according to the specifications provided for each measure and for <br /> demonstrating that the action has-been success"completed.'San Joaquin County,at its discretion,may <br /> delegate implementation respoiis bility or portions thereof to the developer(GNK,LLC),a licensed <br /> contractor or other designated agent. <br /> San Joaquin County will be responsible for overall administration of the MMRP and for verifying that <br /> County staff members,and/or the construction contractor has completed the necessary actions for each <br /> measure.San Joaquin County will designate a project manager to oversee the MMRP during the <br /> construction period.Duties.of the project manager include the following: <br /> < Ensure that routine inspections of the construction site are conducted by appropriate San Joaquin <br /> County staff,check plans,reports,and other documents required by the MMRP;and conduct report <br /> activities. <br /> < Serve as a liaison between San Joaquin County,the Mountain House Community Service_s District <br /> (MHCSD),and the construction contractor regarding mitigation monitoring issues. <br /> < Complete forms and maintain reports and other records and documents generated by the MMRP. <br /> College.Park at Mountain House Specific.Plan III EDAW <br /> San Joaquin County 1 Mitigation Monitioring,and Reporting Program <br />