Laserfiche WebLink
� o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure TiminglSdtedule Responsibility Action Date <br /> Completed <br /> 4.6-3 Cultural Resources---Potential to Uncover Human During construction SJCCDD,in <br /> Remains conjunction with the <br /> In accordance with the California Health and Safety developer,and in <br /> Code,if human remains are uncovered during conjunction with <br /> 48 construction at the project site,the College Park qualified archaeologist <br /> - developer or construction contractor shall immediately and County Coroner, <br /> halt potentially damaging excavation and notify if needed. <br /> SJCCDD.The County shall,in turn,immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery onprvate or state lands(HSC Section <br /> a, 7050.5[b]).If the coroner determines that the remains <br /> are Chow of a Native American,he or she shall contact <br /> the NafiVe American Heritage Commission(NAHC) <br /> by phonewithin 24 hours of making that <br /> �i determination(HSC Section 7050[c]).Onoe a Most <br /> Likely Descendent(Nn D)has been designated by tine <br /> tn NAHC,the MLD,in consultation with the County, <br /> 10 shall determine the uubi mte disposition of the remains. <br /> The responsibilities of the County for acting upon <br /> notimaticnu of a discovery of Native American human <br /> remains ate oWthed in detail in the PRC Section <br /> 5097.9.Mea"'likely resulting from the above <br /> could inc hide p esernation in place and <br /> eappingtavoidance,or removal and continued <br /> maoitoring of ground-disturbing activities. <br /> a <br /> 4.7 DRAINAGE <br /> 4.7-2 Drainage—Result in Flooding or Exceed the Before construction MHCSD,in <br /> a' Capacity of the Storm4rain System conjunction with the <br /> The.College Park developers shall expand WQBI as developer <br /> required to accommodate runoff from the College <br /> Pain project,or shall provide the required.on-site <br />