Laserfiche WebLink
College Park at MownWn Hoagie Specific Plan M <br /> Mioption Monitoring and Reporting Program <br /> ImpkuTwtadon g Vedflm ron <br /> Mftd"on Measure Timing/Schedule I mplsmen R"m& Accton Datta <br /> Completed <br /> Health.Department shall identify"no furdw <br /> actions required"before project construction <br /> access atm locati .s- <br /> < Phase I Envirosawtal Site Assesses(ESM) <br /> shall berepsred by qualified hazardors materials <br /> expo for areas in Grant:Line Village that are the <br /> " subject of Mune,development p;opvsals.before <br /> �► coqstructiau in these areas:The LSAs,.shaff be <br /> reviewed approved b}+me county, <br /> Vital,%Wth Department.Any <br /> recommendations,rade iA the ESAs'(monitoring, <br /> Phase II testing,mitigation;etc.)shall be, <br /> J <br /> iuipl •. <br /> < Project grading,exe9vation,.and other earth- <br /> moving activities.directly adjacent to the'off-site <br /> Parcel.Where Ae December 4,2003 ande oil <br /> release tDOk place shall not occur until it has been <br /> vm*d,either by the assessment currently being <br /> conducted 1sy the RVVQCB.or separate soil and <br /> groutuiwater sampling <br /> commissioned by the <br /> College Park developers,that the contamination <br /> associated with the.incident has not mi&ted to <br /> 3 the College Park site.If the Contamination has <br /> migrated to the College Park site,it shall be fully <br /> remediared to the satin aKi of f6e County <br /> a Environmental Health Depa tment before project <br /> ;U construction activities in the contaminated area. <br /> < Project construction activities at hazardous <br /> CE and <br /> sites#3 and 7(identified in Figure 4.9-2 <br /> and Table 4.9-1 of the BIR)shall occur only after <br /> M any contamination that may exist at these sites has <br /> y been fully remediated to the satisfaction of the:, <br /> County Environmental Health Department,the <br /> status of the sites has been changed to`�o further <br />