Laserfiche WebLink
Coftep Park at Mountain House Specific Plan M <br /> Miligadon Monitoring and Reporiting,Program <br /> Implementation&Verification <br /> Mitigation Measure Timing/ScheduleImplementation l}a� <br /> Responsibility Action Completed <br /> shall be reviewed and approved by CDE,DTSC, <br /> x the SJCCDD,and the lammersville School <br /> District.If these agencies.detetmme,based on the <br /> PEA,that the school site does not meet CDE <br /> siting requiremeota,the proposed school shall be <br /> developed-at a different location within the,, <br /> College.Perk site,subject to clearance by a new <br /> PEA to be fimded by the developeziL If tine new <br /> school site is required,the developers shall be <br /> responsible for processing the required <br /> amendment to the College Park Specific-Plan III <br /> and obtanung and dedicating the new school site <br /> 4, to the school district.The assessment and analysis <br /> would be conducted in accordance with CDB <br /> requirement and.would be under separate CEQA <br /> documentation. <br /> 4.9-5 Public$eafth and Safety—Ezposure to Pipeline During design phase SJCCDD,in <br /> Hazards conjunction with the <br /> CO The following measures shall be implemented by the developer. <br /> o College hark developers: <br /> < No habitable residential structures(i.e.,homes, <br /> aparim ,granny flats,garages converted to <br /> living quarters,patio rooms,aun rooms)shall be <br /> permitted within 68 fixt of the PG&X Chevron <br /> m <br /> pipeline'flat bisects the College Park site and <br /> F._ contains Pipelines 1401,1.002,and CSDF 0499. <br /> C Alternatively,no habitable residential structures <br /> as defined above shall be permitted within 68 <br /> feet of the nearest pipeline in the PG&E <br /> easement.Outdoor structures such as pools, <br /> M fences,patios,and decks could be allowed within <br /> n the no build zone,since occupancy would be less <br /> . than 100%.Garages would be permitted as long <br />