Laserfiche WebLink
College Park at Mountain House SpeMc Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Mitigation Measure Timingl5chedule IRowespons bi� Mon Date <br /> 3 Completed <br /> begins during the nesting season(April 1 August <br /> 31),pre-constriction surveys shall be conducted <br /> during the nesting season iri suitable nesting <br /> habitat within 100 feet of arses of project <br /> activity.The sum shall be conducted within <br /> the"Z weeks before co t or tree removal <br /> begins.A setba&of I00 feet fxorn loggcrlitid <br /> shrike nesting areas shall-be established and <br /> _ mambined4unng the nesting season fortbe <br /> period "MM nest budding and <br /> continuing until thdglings leave nests.This <br /> setback applies never construction or other <br /> N grouad: 6ativlties must begin during <br /> a <br /> the,'nes*sti ison in the presence of nests that <br /> are known to be occupied.`Se9wh'shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blarkbird.Ifpro]e be$iogg <br /> ao the nesting season(April 1-August 3I),pre- <br /> construction surveys shall Tie conducted during <br /> the besting season in suitable nesting habitat <br /> witbin 500 feet of areas of prdjegt activity.A <br /> setback of 300 feet from California horned lark <br /> and`ttivuco6w blackbird nesting mss shall be <br /> estalilisld and wined during the nesting <br /> season ft the period encompassing nest budding <br /> M and continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> +� the nesting season in the presence of nests that <br /> m are known to be occupied Setbacks shall be <br /> a marked by brightly colored temporary fencing. <br /> L4.i0-9 Biological Resources--Conversion of San Joaquin Before construction SJCOG,in <br />