Laserfiche WebLink
College Park at Mountain House Specific Plan III <br /> Ni figatlon Monitoring and Reporting Program <br /> Implementation&Veriftaljion <br /> Ot O Mitigation Measure Timing/Sdhedule Implementation <br /> 3 Responsibility Action Daw <br /> COOPI(W <br /> �• for Protection of the San Joaquin Kit Fox before <br /> or during Ground Disturbance(US Fish and <br /> Wildlife Service[FWS] 1999b)shall apply <br /> CO ( flail survey PMt000ls <br /> shall Temaitr as establish is the above <br /> -, paraMh).These standards include provisions <br /> educating motion wpkers regarding the kit <br /> fox,leceping heavy equomi t operating at safe <br /> speeds;.checking constructim pipes for,kit fox <br /> occupation during construction,and similar low- <br /> or,no-cost activities. <br /> 4.10-10 Biokq*9 Resources—Loss or Aft tion of. Before construction SJCOG,in <br /> W Juriadiedonai Waters of the United States coordination with <br /> Impacts towaters of the Unied:Stalas arc not currents DFG,USACE and/or <br /> mitigated by participation in the SJMSCP.Therefore, RWQCB <br /> the Collego Park developers shall irWI=gnt the <br /> following measures: <br /> < Before ilemsntation of any Tentative Map or <br /> m <br /> develoPrnent acct(if no Tentative.Map)under <br /> the College Park:pMec4 a foul Section 404 <br /> delineation of waters of the'United Slates, . <br /> including wetlands,shall be condrctedby a <br /> qualified biologist m the Tentative Map or <br /> �. devclapnnt project ares if the area mchxks <br /> features that are;potentially subject to United <br /> States Army Corp of$yrs(USACB). <br /> M jurisdiction(ponds,irrigation can*and <br /> drainages).The delineation shall be submitted to <br /> USACE for verification. <br /> < If,based on the verified delineation,it is <br /> my determined that fill of waters of the United States <br /> would result from the Tentative Map or <br /> development project,authorization for such fill <br />