Laserfiche WebLink
K m <br /> o <br /> a <br /> College Park at Mountain House Specific Plan IH <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> cn Completed <br /> CL 1110- Mobile-Source TAC Emissions—The College <br /> T Park applicants for industrial or commercial land <br /> uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> cn particulate matter(PM)may occur and to review <br /> methodologies that may become available to <br /> estimate the risk.The developers shall implement <br /> :3 any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> N The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> CD <br /> 4.12-5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD,in <br /> CD <br /> Emissions of Criteria Pollutants begins and during conjunction with the <br /> The College Park developers shall implement all of construction developer <br /> the mitigation measures as recommended in the <br /> o Guide for Assessing and Mitigating Air Quality <br /> Impacts(S7VAPCD 1998).Many of these measures <br /> m• are already included in the proposed project design <br /> z <br /> z and/or are already required by the MHMP and by <br /> m 0 mitigation in the MHMP"and Delta College EIRs. <br /> :3 cn <br /> rCn <br /> v -0 <br /> 0 <br /> C7 � <br /> o � <br /> c � <br />